Plumbing Installation 

The TechPaq installs using standard 2 inch heater unions. The TechPaq uses a standard 12 inch heater vessel. The 
TechPaq is designed to allow the heater union nuts to retract fully for installation so it is not necessary to disassemble the 
TechPaq or remove the front cover to perform the plumbing installation. Carefully orient the TechPaq in position and 
tighten the heater unions.  
 

Mechanical Installation 

Each repair installation is different. Depending on the location of existing mounting brackets or straps and the location and 
type of plumbing connections you may wish to use the included mounting brackets. The supplied mounting brackets can 
be used either by themselves or with existing brackets. For mechanical installation there are four (4) holes in the back of 
the TechPaq enclosure to receive the supplied #10 self-tapping screws. Either existing brackets or the supplied mounting 

brackets can be attached to one or more of 
these mounting locations using a #10 self-
tapping screw. Normally it is not necessary to 
remove the front cover to perform the 
mechanical installation however, depending on 
circumstances of a particular installation, you 
may wish to remove the front cover to allow 
threading the self-tapping screws from the 
inside of the TechPaq enclosure. The mounting 
brackets can be attached to supports above or 
below the TechPaq. Additionally the supplied 
mounting brackets may be connected to each 
other using the supplied #10 screws to add 
additional length. It is sometimes useful to use 
the additional length to provide a mechanical 
connection on the side of the TechPaq opposite 
the heater union connected to pump one. Also 
since the TechPaq is designed to be compact to 
fit easily into existing installations you may 

chose to use the supplied mounting brackets to bridge to the existing mounting brackets or other support.  
 

Electrical Installation 

Check the label on the left side of your TechPaq to find the maximum allowable circuit breaker ampacity. Ensure that the 
dedicated circuit is protected by a properly sized GFCI breaker and that the ground is properly sized. Remove the front 
cover of the TechPaq. The TechPaq has an electrical entry sized for 1 inch conduit on the left side of the enclosure and 
includes a set of reducing washers for ¾ inch conduit. Attach the conduit you are using ensuring that the electrical wires 
protrude at least 6 inches beyond the conduit entry. Connect the wires to the barrier strip. The wire size range for 120 volt 
packs is #12 AWG to #8 AWG copper conductors. The wire size range for 240 volt packs is #12 AWG to #6 AWG copper 
conductors. Do not use aluminum conductors. The neutral conductor connects to terminal position 2 and the line 
conductor(s) connects to terminal 1 for 120 volts packs and terminals 1 and 3 for 240 volt packs. The ground connects to 
the ground terminal.  Also connect all equipment bonding grounds to the grounding terminals on the exterior of the 
TechPaq. Be sure to tighten all connections carefully. A loose connection will generate heat that will damage the terminal.  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Copyright © 2003-2006 by Thermaq Corporation, Everett Washington, USA 

TechPaq Back View 
 
 
 
 
Mounting Screw 
Locations (may vary 
slightly with model) 
 
 
 
 
 
 
 
Figure 1. 

 

 

     Ground           Line          Neutral 
     Terminal      Terminal    Terminal  

 
                                 Figure 2.     

 

 

 Ground      Line1       Neutral     Line2 
Terminal   Terminal  Terminal  Terminal 

                      

1               2             3 

 

                                 Figure 3. 

     Field  
    Wiring 
 
 
  TechPaq 
  120 VAC 
    Units 
 

     Field  
   Wiring 
 
 
  TechPaq 
  240 VAC 
    Units 