4.3 Serial Network (FPC-N34): W iring Field Port for BACNET RS-485 Network
•
Connect the BACnet RS-485 network wires to the 3-pin RS-485 connector on ProtoNode FPC-
N34 as shown below in
o
Use standard grounding principles for RS-485 GND
•
See
for information on connecting to BACnet/IP network.
•
If the ProtoNode is the last device on the trunk, then the End-Of-Line Termination Switch needs
to be enabled (
).
o
The default setting from the factory is OFF (switch position = right side)
o
To enable the EOL Termination, turn the EOL switch ON (switch position = left side)
4.4 LonW orks (FPC-N35): W iring LonW orks Devices to the LonW orks Terminal
•
Wire the LonWorks device network to the ProtoNode LonWorks Terminal.
o
Use approved cable per the FT-10 installation guidelines
•
LonWorks has no polarity.
BACnet
BMS Wiring
ProtoNode
Pin #
Pin
Assignment
RS-485 +
Pin 1
RS-485 +
RS-485 -
Pin 2
RS-485 -
-
Pin 3
RS-485 GND
Figure 17: RS-485 BMS Network EOL Switch
End-of-Line Switch
Figure 18: LonWorks Terminal
Figure 16: Connection from ProtoNode to RS-485 Field Network