SERVICE TROUBLESHOOTING
4-18
Manual 0-2728
5. FET Output Rectifier Check
NOTE
Refer to the Appendix Pages for PC Board Lay-
outs.
Use a digital meter, diode or ohms function, to check
the forward and reverse bias of the output rectifiers
on the FET/Heatsink Assemblies as follows:
a. Remove the wire from E16 and E18 on the Upper
and Lower FET/Heatsink Assemblies.
A-01415
E16
E18
E19
E17
E14
E15
b. Place the meter (+) lead on E16 and the meter (-)
lead on E18 of the FET/Heatsink Assembly to
check the output rectifier forward bias. The meter
should indicate between 0.3 to 0.6 volts using the
diode function or 100K ohms using the ohms func-
tion.
c. Place the meter (+) lead on E18 and the meter (-)
lead on E16 of the FET/Heatsink Assembly to
check the output rectifier reverse bias. The meter
should indicate 'OL' using the diode function or
100K ohms using the ohms function.
d. Place the meter (+) lead on E17 and the meter (-)
lead on E19 of the FET/Heatsink Assembly to
check the output rectifier forward bias. The meter
should indicate between 0.3 to 0.6 volts using the
diode function or 100K ohms using the ohms func-
tion.
e. Place the meter (+) lead on E19 and the meter (-)
lead on E17 of the FET/Heatsink Assembly to
check the output rectifier reverse bias. The meter
should indicate 'OL' using the diode function or
100K ohms using the ohms function.
f. Place the meter (+) lead on E18 and the meter (-)
lead on the heatsink of the FET/Heatsink Assem-
bly to check the output rectifier resistance to
ground. The meter should indicate >1 meg ohms.
Replace the upper or lower pair of FET/Heatsink
Assemblies if any of the above tests are open or
shorted.
6. FET Output Clamp Diodes Check
NOTE
Refer to the Appendix Pages for PC Board Lay-
outs.
Use an ohmmeter to check the resistance of the out-
put clamp diodes, (+ out) E17 and (- out) E18, as fol-
lows:
NOTE
The wires on E16 and E18 should still be discon-
nected from both FET/Heatsink Assemblies.
a. Place the meter (+) lead on E17 and the meter (-)
lead on E18 of the FET/Heatsink Assembly to
check the output clamp diode resistance. The
meter should indicate >1 meg ohms.
b. Place the meter (+) lead on E18 and the meter (-)
lead on E17 of the FET/Heatsink Assembly to
check the output clamp diode resistance. The
meter should indicate >1 meg ohms.
Replace the upper or lower pair of FET/Heatsink
Assemblies if any of the above tests are open or
shorted.
Summary of Contents for PAK Master 150XL
Page 2: ......
Page 6: ......
Page 16: ...INTRODUCTION 2 2 Manual 0 2728...
Page 61: ...Manual 0 2728 6 5 PARTS LISTS 7 1 2 6 3 A 02580 8 5 4 10 9 9...
Page 86: ...APPENDIX A 18 Manual 0 2728 APPENDIX 14 SYSTEM SCHEMATIC Unit Rev AQ or Earlier A 02329...
Page 88: ...APPENDIX A 20 Manual 0 2728 APPENDIX 14 SYSTEM SCHEMATIC Unit Rev AR or Later A 03054...
Page 90: ......