Page 5
6. Gently dettach the mounting template and turn it 180
degrees. Locate the template against the centerline to
make the other pilot holes.
Cent
er
lin
e
Roof
DIM0
15148
9
Roof
Roo
f
Ø
Ø
33
//
16
16
""
(4.7 m
m)
(4.7 m
m)
48"
36"
30"
48”
Duct
cover
Left e
dge
48”
Duct
cover
Insstal
lation
hole
s
s
36”
Duct
cover
Instal
lation
hole
s
30”
Duct
cover
Instal
lation
hole
s
36”
Duct
cover
Left e
dge
30”
Duct
cover
Left e
dge
Ø
3
/
16
"
(4.
7 mm
)
36"
30"
48"
48”
Duc
t co
ver
Right
ed
ge
36”
Duc
t co
ver
Righ
t ed
ge
30”
Duc
t co
ver
Righ
t e
dge
48”
Duc
t co
ver
Ins
tall
atio
n ho
lese
36”
Duc
t co
ver
Ins
tall
atio
n ho
les
30”
Duc
t co
ver
Insta
llat
ion
ho
les
Ce
nte
rline
on
wa
ll
Roof
Roof
Ø
3
/
16
"
(4.
7 mm
)
Ø
3
/
16
"
(4.
7 mm
)
48"
36"
30"
48"
36"
30"
48”
Duc
t co
ver
Left e
dge
48”
Duc
t co
ver
Insta
llat
ion
ho
les
36”
Duc
t co
ver
Insta
llat
ion
ho
les
30”
Duc
t co
ver
Ins
tall
atio
n ho
les
36”
Duc
t co
ver
Left
ed
ge
30”
Duc
t co
ver
Left ed
ge
Ø
3
/
16
"
(4.7 m
m)
36"
30"
48"
48”
Duct
cover
Right
edge
36”
Duct
cover
Right
edge
30”
Duct
cover
Right
edge
48”
Duct
cover
Instal
lation
hole
s
36”
Duct
cover
Instal
lation
hole
s
30”
Duct
cover
Instal
lation
hole
s
7. Mount the duct cover bracket on the top of the ceiling
using four 5 x 45 mm screws. Ensure that the
bracket is level.
8. Insert the complete duct cover at an angle and swivel
toward the wall.
9. Carefully pull the top part of the extension upwards.
Screw the left and right sides of the extension to the
mounting bracket with the supplied 4.2 x 8 mm screws.
10. From inside of hood, screw the supplied 4.2 x 8 mm
sheet metal screws through the holes on each side
and along the front into bottom of the extension.