5.3 Concrete Specifications for In-Ground Installation

In order to offset the effects of buoyancy caused by groundwater (high water tables), strengthen the 

sideload of the unit, and prevent movement of the unit in the event of shifting earth, Thermaco, Inc. 

recommends concrete be poured around the entirety of Trapzilla

®

 units installed in-ground in the amounts 

of concrete specified in the table below.  The concrete must to be poured continuously and completely 

surrounding the Trapzilla

®

 body (and Extension Collars if applicable) to ensure proper strength and 

security at a compression strength of 4000 psi (C28/35).

5.4 Concrete Calculations for TZ-1826 Models/Components*

Amount of Concrete

Trapzilla Model

Weight in lbs. (Kg)

Volume in Cubic Yards (m

3

)

TZ-1826

3950

1.0

ECA-TZ-29 (each)

600

0.20

5.2 Plumbing Instructions for TZ-1826 with Optional ECA-TZ-29 Extension Collars (purchased 

separately)

In some cases, TZ-1826 may be installed in locations where built-in extension collar will not reach grade.  

In these cases, the two-piece ECA-TZ-29 Extension Collar (purchased separately) may be used to make 

lid accessible at ground level. Follow instructions included in ECA-TZ-29 packaging for installations.  

Each TZ-1826 would require two (2) ECA-TZ-29 if pipe depth requires.

* In-ground installation instructions only applicable for units installed where center of outlet pipe is 

no more than 60” below grade.  For all installations deeper than this, Thermaco must be contacted 

to verify site conditions and provide further instructions for proper installation.  Failure to abide by 

this instruction will result in voiding the warranty of the unit.

In-Ground Installations inside of a building must have a vessel vent installed and piped to at-

mosphere.

Note: Drawing for reference only.  Equipment must be installed in compliance with all applicable laws, regulations 

and codes, including plumbing codes.  Installation should be performed by a qualified plumber. 

ECA-TZ-29

Two-piece extension 

collar with 4-29” of 

extension. Connect 

bottom piece to built-

in extension collar 

and use original lid 

provided.

Built-in  

extension

Follow instructions 

on pages 18-19 to 

set built-in extension 

collar.  When pos-

sible adjust height 

of built-in extension 

collar before trimming 

ECA-TZ-29.

Summary of Contents for Trapzilla TZ-1826

Page 1: ...HOLE OR PART WITHOUT WRITTEN CONSENT FROM THERMACO INC POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREE...

Page 2: ...There are many factors influencing odor evolution and dissemination These include room ventilation kitchen menu ambient temperatures ware washing practices grease oil input daily input fluid volume sa...

Page 3: ...andard STC 22 cover Each TZ 1826 would require two 2 FTCA 22 covers SSA 1826 Support Stand for TZ 1826 forAbove Ground Installations Must be fully supported not to be installed over grates Included wi...

Page 4: ...diameter of the system s outlet connection must be present as close as possible to the Trapzilla outlet to prevent possible siphonage problems The Vent on the Outlet piping is to be installed in accor...

Page 5: ...ut before and after all Trapzilla Installations Outlet Inlet Cleanout Cleanout Outlet Vent Connect to facility vent Note Drawing for reference only Equipment must be installed in compliance with all a...

Page 6: ...ts Connect to facility vent Low Head Flow Control not pictured to be installed as close as possible to inlet of first grease interceptor Cleanout Note Drawing for reference only Equipment must be inst...

Page 7: ...ESS NOTED 646 GREENSBORO STREET PO BOX 2548 ASHEBORO NC 27203 VOICE 336 629 4651 FAX 336 626 5739 Decimals XX 03 XXX 015 Unless otherwise specified Dimensions are in inches Tolerances Angular 1 CHECKE...

Page 8: ...it may also be installed in the ground inside or outside of the facility For instances where the facility drainage piping requires an extension collar that is more than the 18 provided by the built in...

Page 9: ...s purchased separately In some cases TZ 1826 may be installed in locations where built in extension collar will not reach grade In these cases the two piece ECA TZ 29 Extension Collar purchased separa...

Page 10: ...dapter ring Two of these screws should be installed in each of the four 4 skirt areas of the adapter ring Check the extension collar height dimension frequently during this operation to ensure that th...

Page 11: ...bolts and fully remove the 22 lid to pump out It is not necessary to remove adapter lid to pump out Trapzilla 2 Begin by taking the grease from the top of the main chamber until all grease is removed...

Page 12: ...not arising out of defects in workmanship or materials Thermaco shall not be responsible for damage to Products resulting from ultraviolet light exposure vault flooding sewer line back up pumping or...

Reviews: