
The stake pockets are held in with the.028” wire supplied. Cut into 2” lengths and using a set of flat
pliers to prebend into a U. Mark the location and width of the bend on the plier nose using a casting to
get the right width. Insert the wire into the predrilled holes and pull to the pocket and bend over the
wire on the inside to lock in. You can either leave as is or use a drop of E6000 on each wire end. (Bend
the wire over securely with a screwdriver or something to give a sharp bend on the inside.)
To install the grab irons, remove from the sheet and bend the ends 0.350” from the round end into a
90degree bend. Mount 2 per side sill at each end. Mount one per end beam on the left side(keeping the
deck upside down) Lay the irons flush with the work table to mark and drill #60 the mounting for #0
lag bolts.
To install the steps remove the strips from the sheet and using a
vise or pliers bend at the notch unto a U shape. You will need to
mark and twist the tops to mount to the sills. Do this 4 times.
Mark and drill 4 #60 holes for #0 lags
Note that your steps will not be flush with the end beam.