TSL970
MANUAL 10
5
Install the final wall substrate.
Tap Installation
6
Apply the final wall finish of your choice.
(Tiles, glass, paint etc)
7
Remove the temporary covers from the
lever control and the spout fixing.
8
Install the spout and lever parts.