PLEASE NOTE THE PRESSURE LEVER CAN BE ASSEMBLED ON
THE OTHER SIDE OF THE SPRAYER. TO DO THIS REMOVE THE
SPLIT PIN THAT HOLDS THE ROCKER BAR IN PLACE, THEN
REMOVE THE BAR AND INSERT IT INTO THE OTHER SIDE OF THE
SPRAYER. REASSEMBLE THE SPLIT PIN AND BAR FIXER AS THEY
WERE BEFORE. NOW ADJUST THE CARRYING STRAP, YOU MAY
WANT TO CONNECT IT TO THE OTHER SIDE OF THE SPRAYER.
INSTALLATION OF THE SPRAYER
INSTALL THE SPRAYER ACCORDING TO THE DRAWING BELOW
STEP BY STEP
OPERATION
OPEN THE CAP OF THE CONTAINER , POUR THE LIQUID INTO THE
CONTAINER SLOWLY. CLOSE THE CONTAINER TIGHTLY AND LIFT
THE SPRAYER ONTO YOUR BACK. PUSH THE LEVER FOR THE
PUMP UP AND DOWN AND WHEN THE PRESSURE IN THE AIR
CHAMBER INCREASES PRESS THE LEVER AND BEGIN TO SPRAY.
WHEN YOU HAVE FINISHED SPRAYING ALWAYS EMPTY THE
CONTAINER COMPLETELY. REINSTALL THE SPRAYER AS PER THE
INSTRUCTION SHEET SHOWN IN THE ABOVE DIAGRAM.
50 WORKING HOURS TO AVOID FRICTION.