background image

Page 2

CONTENTS

SAFETY INSTRUCTIONS

3

SPECIFICATIONS

4

FUEL

4

ASSEMBLY

5-7

HINTS AND TIPS

8

MAINTENANCE

9

PARTS DIAGRAM AND LIST

10-11

EC DECLARATION OF CONFORMITY

12

Summary of Contents for THCS-65

Page 1: ...Page 2 CONTENTS SAFETY INSTRUCTIONS 3 SPECIFICATIONS 4 FUEL 4 ASSEMBLY 5 7 HINTS AND TIPS 8 MAINTENANCE 9 PARTS DIAGRAM AND LIST 10 11 EC DECLARATION OF CONFORMITY 12 ...

Page 2: ...redding at least 15m Inspect the machine before each use for any worn or damaged parts Do not use until the parts are repaired or replaced Check that nuts screws and bolts are securely fastened Have a clear work area and secure footing and do not operate the machine in an enclosed area Ensure that the plastic cover on the upper hopper is closed when the shredder is running to avoid any debris flyi...

Page 3: ...anywhere near a flame or spark Allow the engine to cool before re fuelling Fuel the engine at least 3m away from your work area Use fresh unleaded petrol and good quality four stroke engine oil SAE10W30 or SAE10W40 Refer to the instructions on page 7 together with the separate engine instructions for details of fuelling the machine If the shredder is not going to be used for a long period drain th...

Page 4: ...s easier if there are two people Remove the machine from the crate and place on a sturdy support as shown in Fig 1 Referring to Fig 2 attach the front foot to the machine Remove the nuts from bolts 1 and 2 remove the bolts and pipe spacer Align the discharge hopper to holes 1 and 2 Attach front foot 5 to the side and align the mounting holes 1 and 2 Put the pipe spacer back in place Insert the bol...

Page 5: ...into hole 6 and secure tightly with locknut Attach the chipper tube to the machine referring to Fig 4 below Remove the nuts and washers of the two top threaded studs and loosen the bottom two nuts Put the chipper tube 2 in place on the side by positioning the plate over the bottom studs and securing the nuts on the top studs Secure the flange with washers and nuts M8 Make sure the tube is located ...

Page 6: ...uring that it is 10 15mm from the top of the tank Fill the fuel tank with unleaded petrol again do not fill closer than 10 15mm from the top to allow for expansion Wheel the shredder to the work site and place a collection receptacle under the discharge chute or allow the shreddings to fall to the ground Starting the Chipper Shredder Fill with fuel and oil as directed above Turn the ignition switc...

Page 7: ...he maximum diameter of 50mm 20in Do not allow a build up of shreddings chipping to accrue underneath the shredder It may interfere with the discharge chute Always use wooden tools to clear any blockage not metal or your hands Leaves and Grass Shredding Do not open the plastic cover when adding more material Leaves and grass will be difficult to feed automatically into the hopper use a wooden stick...

Page 8: ...ing the Belt The V belt may need replacing if it becomes too long or is damaged Turn off the engine and remove the belt cover Carefully remove the old belt Place the new belt in the main pulley first V belt on engine and then on to the affiliated pulley beside the blade tray The new belt will be tighter than the old so this can be a little tricky Replace the belt cover Adjusting the Hammer There a...

Page 9: ...Page 10 PARTS DIAGRAM ...

Page 10: ... 1 38 TH105 38 Rubber Gasket 1 12 TH105 12 Pin 2 39 TH105 39 Hopper 1 14 TH105 14 Bush 4 40 TH105 40 Handle Grip 2 15 TH105 15 Bush 8 41 TH105 41 Hook 2 16 TH105 16 Bush 4 42 TH105 42 Hex Bolt 1 17 TH105 17 Hammer Flail 16 43 TH105 43 Exhaust Guard 1 18 TH105 18 Bush 4 44 TH105 44 Clutch 1 19 TH105 19 Pin 4 45 TH105 45 V Belt 1 20 TH105 20 Hammer Axis 4 46 TH105 46 Belt Cover 1 21 TH105 21 Blade 2...

Page 11: ...forms to the main safety requirements of the EC Directives listed above This conformity is based on the following standards and normative documents EN 13683 2003 EN ISO 14982 1998 ISO 11094 1991 EN ISO 3744 1995 The conformity assessment procedure followed was in accordance with Annex III of the Directive 2000 14 EC Measured Sound Power Level 108 4 dB A Guaranteed Sound Power Level 110 dB A The re...

Reviews: