3.OD.3B

 

cAvity / frAminG prEpArAtiOn

MODEL

A

A1

B

C

D

E

F

Y

700 D

700

800

400

700

225/325

200

680

295

850L

850

950

450

700

250/350

220

680

322

1050LL

1050

1150

500

700

300/400

240

680

345

D

C

A1

A

B

F

E

Gather

Front

Back

Gather

Y

Table 1

Fig. 2

 

JEtmAstEr BOX DimEnsiOns

Drawings Not 

To Scale

Dimensions in mm

Fig. 1

 

firEBOX instAllAtiOn

1.  Locate and position firebox, fit and seal gather in cavity using fire cement (exhaust cement) and bolts 

(supplied), to the firebox. Note: Pop rivet back of gather to firebox if required (refer to Cross Section). 

Earthquake restraints may be positioned by drilling through firebox into the floor protector, in a position 

midway beneath the log-pan. Two 6mm dynabolts or similar will suffice. Do not over tighten and deform 

firebox.

2.  Attach rock wool (supplied) to the sides of the firebox and gather (using fire cement). DO NOT BLOCK 

OFF the air entry between the inner flue pipe and flue pipe casing or the air circulation between the vent 

holes in the cavity.

3.  Refer to Table 2 & Fig 3 for minimum hearth sizes. Please note, a hearth is not required when the floor 

surface below the fire is non combustible ie: concrete pavers, etc.

Table 2

 

minimum cAvity siZE

Refer to Table 2 for the minimum cavity dimensions and temporary lintel height measurements, until the 

firebox and flue system is installed. 

Note:

 Temporary lintel height is measured from finished floor protector 

level.

Note: 

Wood Installations can be converted to Gas at a later date. Consider running a gas supply to firebox 

cavity at the time of construction.

Dimensions in mm

NOTE: Minimum Recess = 40mm / Maximum Recess = 100mm

ALL INSTALLATIONS MUST COMPLY WITH NZS2918:2001

The Fireplace Ltd recommends all installations be carried out by an 

S.F.A.I.T (SOLId FUeL AUTHORISed INSTALLeR TeCHNICIAN).

MODEL

A

B + recess

Temporary 

Lintel

X min*

Y min*

Z min*

700 D

800

470 + recess

1200

1100

400

75

850L

950

530 + recess

1200

1250

450

75

1050LL

1150

565 + recess

1200

1450

600

75

Summary of Contents for JETMASTER 700 D

Page 1: ...n Solid Concrete Concrete Masonry Block Brick Hebel Block Panel Consult The Fireplace Ltd or your local agent for any variation of the installation specified below NOTE If using timber framing refer to 5 TW 1A for installation instructions A Heat Shield must be used JETMASTER OUTDOOR WOOD FIRE ALFRESCO BBQ INSTALLATION INSTRUCTIONS TYPICAL IN BUILT MASONRY BLOCK 9 2013 IMPORTANT Read all instructi...

Page 2: ...ntry between the inner flue pipe and flue pipe casing or the air circulation between the vent holes in the cavity 3 Refer to Table 2 Fig 3 for minimum hearth sizes Please note a hearth is not required when the floor surface below the fire is non combustible ie concrete pavers etc Table 2 MINIMUM CAVITY SIZE Refer to Table 2 for the minimum cavity dimensions and temporary lintel height measurements...

Page 3: ...2 for temporary lintel height Jetmaster Flange Allow 5mm gap between plaster and flange to ensure stainless steel cover can be fitted to the box DO NOT PLASTER OVER THE FLANGE A minimum 75mm thick Floor protector is only required if finished surface is combustible e g timber decking Please note that these dimensions based on Masonry margins are the absolute minimum sizes widths A B maybe increased...

Page 4: ... fitted over the flue pipe 6 Before fitting casing cover place the spider in opposition with the spider post facing down between the flue pipe and flue pipe casing Secure spider in position Place the casing cover over the flue pipe press down firmly onto the spider Check airway around the casing cover is clear then secure in position using three stainless steel rivets 7 Fit cowl to top of flue DO ...