DOCUMENT No.:
REVISION: 1.2
DATE: 2014/11/10
DC-MAM-001-X-C-2
Page 201
5.2.14.1
THROTTLE LEVER FRICTION ADJUSTMENT
TOOLS / EQUIPMENT REQUIRED
ITEM
QUANTITY
NOTES
1
3/8 Spanner
2
2
2 mm Allen key, 2.5 mm Allen key
1 each
Inspection panel screws.
The above list is not necessarily a complete list of all required tools and equipment needed. A calibrated torque
wrench (with adequate range) and the correct size (as implied by the above tool list) accessories (sockets etc.)
are implied for torqueing bolts / nuts, if applicable. Refer to paragraph 1.5 for torque values.
CONSUMABLE MATERIAL REQUIRED
ITEM
QUANTITY
NOTES
1
Split pin
1.
2
Loctite 222
As needed
Centre console inspection panel.
The above list is not necessarily a complete list of all material needed. Refer to the Sling 2 construction manual.
AUTHORISED PERSONNEL
Any person performing maintenance of any kind on the aircraft or any component thereof must do so in
accordance with national legislation. This is the responsibility of the aircraft owner and any person who is to
perform any maintenance on the aircraft.
PROCEDURE
1.
Remove the centre console side inspection panel.
2.
Remove split pin and discard (do not re-use).
3.
Inspect all bolts and nuts for damage. Replace if necessary.
4.
Adjust castle nut and thickness of washers to attain required friction (refer to Figure 46).
5.
To inspect ground run the engine and move throttle lever to arbitrary positions across its
complete range of travel, and to the extreme rear position, and verify that adequate friction can
be maintained against the pull of the carburettor springs.
6.
Fit new split pin (do not use previously used split pin).
7.
Apply thread locking sealant to the centre console inspection panel screws before fitting.
Summary of Contents for Sling 4
Page 1: ......