Standard Wiring
Wiring Diagram
Universal voltage driver permits operation a 120V to 277VAC, 50 or 60Hz.
1. Connect the black fixture lead to the (+) LINE supply lead.
2. Connect the white fixture lead to the (-) COMMON supply lead.
3. Connect the GROUND wire from the fixture to supply ground.
Cleaning & Maintenance
CAUTION: Be sure fixture temperature is cool enough to tough.
Do not clean or maintain while fixture is energized.
1. Clean lens with a gentle lens cloth.
2. Do not open fixtuer to clean the LED. Do not touch the LED.
Troubleshooting
• Verify the proper line voltage is present and the fixture is wired correctly.
• Check that the fixture is grounded.
Top Visor Installation [Order Separately]
1. Remove the screws out from the front cover (see Fig.5 for screw locations).
2. Using longer screws provided with visor, align the holes on the front cover with visor
to secure in place.
Wire Guard Installation [Order Separately]
1. Drill 4 threaded holes for M3 screws , between 0.15” - 0.19”
(see Fig.4 for hole locations).
2. Using M3 screws provided with the wired guard , align wired guard with
the holes and secure into place.
www.trulygreensolutions.com
Impakt™
Architectural Floodlight
Installation Instructions
Black (+)
LIGHT FIXTURE
No Photocell
White (-)
Green (Grd)
Black (+)
Black
Red
LIGHT FIXTURE
TO SOURCE
Photocell
White (-)
120-277V
Green (Grd)
Fig.4
Fig.5