TGS Impakt Installation Instructions Download Page 2

Standard Wiring

Wiring Diagram

Universal voltage driver permits operation a 120V to 277VAC, 50 or 60Hz.

   1. Connect the black fixture lead to the (+) LINE supply lead.

   2. Connect the white fixture lead to the (-) COMMON supply lead. 

   3. Connect the GROUND wire from the fixture to supply ground. 

Cleaning & Maintenance

CAUTION: Be sure fixture temperature is cool enough to tough.

Do not clean or maintain while fixture is energized.

  1. Clean lens with a gentle lens cloth.

  2. Do not open fixtuer to clean the LED. Do not touch the LED.

Troubleshooting

• Verify the proper line voltage is present and the fixture is wired correctly.

• Check that the fixture is grounded.

Top Visor Installation [Order Separately]

1. Remove the screws out from the front cover (see Fig.5 for screw locations).

2. Using longer screws provided with visor, align the holes on the front cover with visor

   to secure in place.

Wire Guard Installation [Order Separately]

1. Drill 4 threaded holes for M3 screws , between 0.15” - 0.19” 

   (see Fig.4 for hole locations).

2. Using M3 screws provided with the wired guard , align wired guard with 

    the holes and secure into place.

www.trulygreensolutions.com

Impakt™

Architectural Floodlight

Installation Instructions

Black (+)

LIGHT FIXTURE

No Photocell

White (-)

 

Green (Grd)

Black (+)

Black

Red

LIGHT FIXTURE

TO SOURCE

Photocell

White (-)

120-277V

 

Green (Grd)

Fig.4

Fig.5

Reviews: