
Connecting the Power Supply
Caution
Observe relevant Electricity Board regulations while powering up the pumpset
Warning
Before inserting the power plug or connecting the wires to the terminal board, make
sure the power supply is properly disconnected. Failure to do so may lead to electrical
shock, short, or injury caused by the unintended starting of the pump
Caution
Do not use damaged cables, power plugs, or loose power outlets. Failure to observe
this precaution could lead to electrical shock, short circuit or fire
Power cable connection to Non-clog Sewage Pump
Refer Fig. 9a and 9b, shown below, for connecting the lead wires to the Terminal Board of Single-phase and Three-
phase Non-clog Sewage Pumps.
Connection diagram for capacitor start and run motor
Note: If top fails, interconnect Z2 & A2 using 1.5 mm² wire
Z1
Z2
A1
A2
CONNECT 220V SINGLE PHASE
SUPPLY TO A1 & A2
(GREEN)
CAPACITOR
TOP
STARTING COIL
(RED)
(YELLOW)
RUNNING COIL
(BLUE)
Z1
Z2
A1
A2
Fig. 9 Cable lead wire connections
Fig. 9(a) Single-phase - NMH-S 7040 / NMH-S1550
OMSP001A
21
2020.01