(e)
BORE WELL
JET UNIT
VERTICAL JET MONOBLOC-TSJ
FOOT VALVE
DELIVERY PIPE
JAR
PRESSURE VALVE
FILLING PLUG
Fig. 1 Jet Monoblock Erection Guide
Page 1: ...Jet Monoblock Installation Procedure...
Page 2: ...n Fig 1 a to d For Bore Mounted Type Vertical Jet Monoblock TSJ Series mount the set on the bore casing pipe shown in Fig 7 e 1 Prepare A Level Concrete Foundation a DELIVERY PIPE JAR PRESSURE VALVE H...
Page 3: ...b DELIVERY PIPE JAR PRESSURE VALVE HORIZONTAL JET MONOBLOC TDSJ SERIES MOUNT 1 8 BSP PRESSURE GAUGE HERE FILLING PLUG FOUNDATION BOLT NUT CONCRETE BASE BORE WELL JET UNIT FOOT VALVE...
Page 4: ...DELIVERY PIPE JAR BALL VALVE PRIMING PIPE FOUNDATION BOLT NUT STRAINER 0 1M MIN SUCTION PIPE SHALLOW WELL JET MONOBLOC HCS SJ SERIES 0 5m c...
Page 5: ...d VERTICAL JET MONOBLOC HCSJ 40 70 90 SERIES DELIVERY PIPE JAR PRESSURE VALVE FILLING PLUG BORE WELL SIDE VIEW JET UNIT FOOT VALVE FOUNDATION BOLT NUT BORE WELL...
Page 6: ...e BORE WELL JET UNIT VERTICAL JET MONOBLOC TSJ FOOT VALVE DELIVERY PIPE JAR PRESSURE VALVE FILLING PLUG Fig 1 Jet Monoblock Erection Guide...
Page 7: ...ontrol valve shown in Fig 2 a and b for optimum discharge is the visual method In this method the pump set is run and adjusting the Round Head Screw 15 and measuring the discharge By trial and error a...
Page 8: ...y and adequately insulated Connect the cable properly to the starter terminals to avoid loose connections Factor in low voltage operation while selecting cable size 6 Electrical Installation Fig 2 A P...