![Texmo Industries Taro HCS SJ Series Instructions & Operating Manual Download Page 16](http://html1.mh-extra.com/html/texmo-industries/taro-hcs-sj-series/taro-hcs-sj-series_instructions-and-operating-manual_1097614016.webp)
9. Pre-installation requirements
Arrangement for installation
General Installation Precautions
Open the packaging and note down the serial number and model for future reference
Ensure all fasteners are tightened properly
Use prescribed pipe sizes as mentioned on the product nameplate
Fit the supplied jet unit with foot valve and the pressure regulating valve
If required, customer can fit a pressure gauge
After installation, prime the set before starting the pump
It is recommended to assemble the Single Phase Jet Monoblock on a level base with foundation
bolts to prevent the pump and piping from getting stressed
As the Single Phase Jet Monoblock is air cooled, ensure that air flow to the cooling fan, located at
the rear side of the motor, is not blocked
Use the services of a professional and trained mechanic with experience to erect Single Phase
Jet Monoblocks
Ensure proper safety during installation
For Horizontal Jet Monoblocks, ensure that a level foundation is ready before erection. Contact
the dealer from whom the pumpset was purchased for details on mounting, before reparing the
foundation
For Vertical Jet Monoblocks, mount the set on top of the borewell
The diameter of the borewell should be checked before lowering the jet unit and pipes into the
borewell. This check will ensure that the jet unit does not get stuck in the bore at any point
Measure the depth of the well / borewell from the ground level
Yield of borewell: this is a measure of the maximum amount of water that can be continuously
drawn from the well while maintaining a stable water level
Lowest water level: During summer, the water level drops and should be taken into account
OMJP001A
16
2020.01