
Power Up and Power Down Procedure
8
SLUUBW3B – October 2018 – Revised June 2020
Copyright © 2018–2020, Texas Instruments Incorporated
UCC2351x Evaluation Module User’s Guide
5
Power Up and Power Down Procedure
5.1
Power Up (C
L
= 1000 pF)
1. Before proceeding to the power up procedure, make sure that
is implemented for setting
up all the equipment.
can be used as reference.
2. Enable supply #1.
3. Enable supply #2.The quiescent current on DMM1 and DMM2 ranges in 1 mA to 3 mA if everything is
set correctly.
4. Enable function generator output.
5. Afterward, the following occurs:
1. Stable pulse output on the channel-A and channel-B in the oscilloscope. See
.
2. Scope frequency measurement is the same as function generator output.
3. DMM #1 and #2 should read measurement results around 5 mA–10 mA under no load conditions.
For more information about operating current, refer to the corresponding datasheet.
Figure 3. Example Input and Output Waveforms (Ch1 is PWM Input, Ch2 is Output)
5.2
Power Down
1. Disable function generator.
2. Disable power supply #2.
3. Disable power supply #1.
4. Disconnect cables and probes.