background image

IN

4

IN

5

GND

1

GND

2

IN

6

GND

3

PAD

7

U31

TVS3300DRVR

IN

4

IN

5

GND

1

GND

2

IN

6

GND

3

PAD

7

U32

TVS3300DRVR

IN

4

IN

5

GND

1

GND

2

IN

6

GND

3

PAD

7

U33

TVS3300DRVR

Protected Line32

Protected Line33

Protected Line34

Protected Line35

Protected Line36

Protected Line37

GND32

GND33

GND34

GND35

GND36

GND37

IN

1

IN

2

IN

3

IN

4

GND

5

GND

6

GND

7

GND

8

NC

9

TVS3301DRBR

U34

IN

1

IN

2

IN

3

IN

4

GND

5

GND

6

GND

7

GND

8

NC

9

TVS3301DRBR

U35

IN

1

IN

2

IN

3

IN

4

GND

5

GND

6

GND

7

GND

8

NC

9

TVS3301DRBR

U36

Schematic

www.ti.com

8

SLVUBJ8 – October 2018

Submit Documentation Feedback

Copyright © 2018, Texas Instruments Incorporated

Flat Clamp TVS Evaluation Module—Adaptor Boards

Figure 12. TVS330X Schematic

Summary of Contents for TVS 0 Series

Page 1: ...igned to fit into industry standard SMA and SMB package types and allow users to test performance in their own systems This user s guide includes setup instructions schematic diagrams a bill of materials and printed circuit board layout drawings for the EVM Contents 1 Introduction 2 2 Board Setup 2 2 1 Surge Testing 3 2 2 ESD Testing 4 3 Schematic 5 4 Layout 9 5 Bill of Materials 10 List of Figure...

Page 2: ... the TVSxx0x in their own system without having to make any changes to their existing schematic or layout The EVM serves as an adaptor board to allow the small size of the QFN chip to be placed pin for pin in the industry standard SMA and SMB surge protector footprints Users can easily replace their existing surge solution chip with the TVS3300 EVM to evaluate the component This EVM kit contains 3...

Page 3: ... to the edge allowing the board to be soldered down 2 1 Surge Testing The adaptor provides an easy way to test the TVSxx0x surge protection as defined in IEC 61000 4 5 Evaluate the TVSxx0x surge protection by exposing the protected line to a surge event The event must be created by a combinational waveform generator CWG in series with a 40 Ω coupling resistor as shown in Figure 3 Test at different...

Page 4: ...5 kV air gap according to the IEC 61000 4 2 standard After installing the adaptor board into the system evaluate the ESD protection provided by the TVSxx0x by using an ESD simulator to create an ESD event on your protected line For specific information on ESD testing procedures see the application report IEC 61000 4 x Tests for TI s Protection Devices Figure 5 shows all the adapter boards that com...

Page 5: ... 2 IN 6 GND 3 PAD 7 U1 TVS0500DRVR GND1 Protected Line1 GND2 Protected Line2 IN 4 IN 5 GND 1 GND 2 IN 6 GND 3 PAD 7 U2 TVS0500DRVR IN 4 IN 5 GND 1 GND 2 IN 6 GND 3 PAD 7 U3 TVS0500DRVR www ti com Schematic 5 SLVUBJ8 October 2018 Submit Documentation Feedback Copyright 2018 Texas Instruments Incorporated Flat Clamp TVS Evaluation Module Adaptor Boards 3 Schematic Figure 6 through Figure 12 display ...

Page 6: ...N 5 GND 1 GND 2 IN 6 GND 3 PAD 7 U7 TVS1400DRVR Protected Line8 GND8 IN 4 IN 5 GND 1 GND 2 IN 6 GND 3 PAD 7 U8 TVS1400DRVR Protected Line9 GND9 IN 4 IN 5 GND 1 GND 2 IN 6 GND 3 PAD 7 U9 TVS1400DRVR Protected Line10 GND10 GND12 GND13 Protected Line13 Protected Line12 GND11 Protected Line11 IN 1 IN 2 IN 3 IN 4 GND 5 GND 6 GND 7 GND 8 NC 9 TVS1401DRBR U10 IN 1 IN 2 IN 3 IN 4 GND 5 GND 6 GND 7 GND 8 N...

Page 7: ...ND 1 GND 2 IN 6 GND 3 PAD 7 U19 TVS2200DRVR IN 4 IN 5 GND 1 GND 2 IN 6 GND 3 PAD 7 U20 TVS2200DRVR IN 4 IN 5 GND 1 GND 2 IN 6 GND 3 PAD 7 U21 TVS2200DRVR Protected Line20 Protected Line21 Protected Line22 GND20 GND21 GND22 Protected Line23 GND23 Protected Line24 GND24 Protected Line25 GND25 IN 1 IN 2 IN 3 IN 4 GND 5 GND 6 GND 7 GND 8 NC 9 TVS2201DRBR U22 IN 1 IN 2 IN 3 IN 4 GND 5 GND 6 GND 7 GND 8...

Page 8: ...e36 Protected Line37 GND32 GND33 GND34 GND35 GND36 GND37 IN 1 IN 2 IN 3 IN 4 GND 5 GND 6 GND 7 GND 8 NC 9 TVS3301DRBR U34 IN 1 IN 2 IN 3 IN 4 GND 5 GND 6 GND 7 GND 8 NC 9 TVS3301DRBR U35 IN 1 IN 2 IN 3 IN 4 GND 5 GND 6 GND 7 GND 8 NC 9 TVS3301DRBR U36 Schematic www ti com 8 SLVUBJ8 October 2018 Submit Documentation Feedback Copyright 2018 Texas Instruments Incorporated Flat Clamp TVS Evaluation Mo...

Page 9: ...ntation Feedback Copyright 2018 Texas Instruments Incorporated Flat Clamp TVS Evaluation Module Adaptor Boards 4 Layout Figure 13 and Figure 14 illustrate the PCB layout images Figure 13 Evaluation Module Top Layer Figure 14 Evaluation Module Bottom Layer ...

Page 10: ...DRV Texas Instruments U10 U11 U1 2 U13 U14 U 15 U16 U17 U18 9 14 V 14 V Precision Surge Protection Clamp DRV TVS1400DRV Texas Instruments U19 U20 U2 1 U22 U23 U 24 U25 U26 U27 9 18 V 18 V Precision Surge Protection Clamp DRV TVS1800DRV Texas Instruments U28 U29 U3 0 U31 U32 U 33 U34 U35 U36 9 22 V 22 V Precision Surge Protection Clamp DRV TVS2200DRV Texas Instruments U37 U38 U3 9 U40 U41 U 42 U43 ...

Page 11: ...y set forth above or credit User s account for such EVM TI s liability under this warranty shall be limited to EVMs that are returned during the warranty period to the address designated by TI and that are determined by TI not to conform to such warranty If TI elects to repair or replace such EVM TI shall have a reasonable time to repair such EVM or provide replacements Repaired EVMs shall be warr...

Page 12: ...the user guide with the maximum permissible gain and required antenna impedance for each antenna type indicated Antenna types not included in this list having a gain greater than the maximum gain indicated for that type are strictly prohibited for use with this device Concernant les EVMs avec antennes détachables Conformément à la réglementation d Industrie Canada le présent émetteur radio peut fo...

Page 13: ...ed loads Any loads applied outside of the specified output range may also result in unintended and or inaccurate operation and or possible permanent damage to the EVM and or interface electronics Please consult the EVM user guide prior to connecting any load to the EVM output If there is uncertainty as to the load specification please contact a TI field representative During normal operation even ...

Page 14: ...COST OF REMOVAL OR REINSTALLATION ANCILLARY COSTS TO THE PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES RETESTING OUTSIDE COMPUTER TIME LABOR COSTS LOSS OF GOODWILL LOSS OF PROFITS LOSS OF SAVINGS LOSS OF USE LOSS OF DATA OR BUSINESS INTERRUPTION NO CLAIM SUIT OR ACTION SHALL BE BROUGHT AGAINST TI MORE THAN TWELVE 12 MONTHS AFTER THE EVENT THAT GAVE RISE TO THE CAUSE OF ACTION HAS OCCURRED 8 2 Specif...

Page 15: ...se resources are subject to change without notice TI grants you permission to use these resources only for development of an application that uses the TI products described in the resource Other reproduction and display of these resources is prohibited No license is granted to any other TI intellectual property right or to any third party intellectual property right TI disclaims responsibility for...

Reviews: