Figure 11-5. PMBus V
OUT
Step-Down = 1.2 V to 0.6 V at 0 A...................................................................................................
15
Figure 11-6. PMBus V
OUT
Step-Up = 0.6 V to 1.2 V at 40 A......................................................................................................
16
Figure 11-7. PMBus V
OUT
Step-Down = 1.2 V to 0.6 V at 40 A.................................................................................................
17
Figure 11-8. PMBUS Multiple Commands.................................................................................................................................
18
Figure 11-9. Transient Response of 1-V Output at 12 V
IN
, Transient is 8 A to 32 A, 2.5 A/µs...................................................
19
Figure 11-10. Output Ripple and SW Node of 1-V Output at 12 V
IN
, 0-A Output......................................................................
19
Figure 11-11. Output Ripple and SW Node of 1-V Output at 12 V
IN
, 40-A Output.....................................................................
20
Figure 11-12. Start up from Control, 1-V Output at 12 V
IN
, 40-A Output...................................................................................
20
Figure 11-13. 0.5-V Pre-bias start up from Control, 1-V Output at 12 V
IN
, 40-A Output............................................................
21
Figure 11-14. Soft Stop from Control, 1-V Output at 12 V
IN
, 40-A Output.................................................................................
21
Figure 11-15. Thermal Image at 1-V Output at 12 V
IN
, 40-A Output..........................................................................................
22
Figure 12-1. First Window at Fusion Launch.............................................................................................................................
23
Figure 12-2. Scan Finds Device Successfully...........................................................................................................................
23
Figure 12-3. Software Launch Continued..................................................................................................................................
24
Figure 12-4. Software Launch Continued..................................................................................................................................
24
Figure 12-5. First Screen After Successful Launch Configure: Limits and On/Off.....................................................................
25
Figure 12-6. Configure: Frequency- FS Configuration Pop-up..................................................................................................
26
Figure 12-7. Configure: Frequency- FS Config Pop-Up with Change.......................................................................................
27
Figure 12-8. Configure:
Store Config to NVM
...........................................................................................................................
28
Figure 12-9. Change View Screen to Monitor Screen...............................................................................................................
29
Figure 12-10. System Dashboard..............................................................................................................................................
30
Figure 12-11. Status Screen......................................................................................................................................................
31
Figure 12-12. Store Configuration To Memory...........................................................................................................................
32
Figure 12-13. PMBus Logging...................................................................................................................................................
33
Figure 12-14. PMBus Log Details..............................................................................................................................................
34
Figure 13-1. PWR-784EVM Top Layer Assembly Drawing (Top View)......................................................................................
35
Figure 13-2. PWR-784EVM Top Solder Mask (Top View).........................................................................................................
35
Figure 13-3. PWR-784EVM Top Layer (Top View)....................................................................................................................
36
Figure 13-4. PWR-784EVM Inner Layer 1 (Top View)...............................................................................................................
36
Figure 13-5. PWR-784EVM Inner Layer 2 (Top View)...............................................................................................................
37
Figure 13-6. PWR-784EVM Inner Layer 3 (Top View)...............................................................................................................
37
Figure 13-7. PWR-784EVM Inner Layer 4 (Top View)...............................................................................................................
38
Figure 13-8. PWR-784EVM Bottom Layer (Top View)...............................................................................................................
38
Figure 13-9. PWR-784EVM Bottom Solder Mask (Top View)....................................................................................................
39
Figure 13-10. PWR-784EVM Bottom Overlay Layer (Top View)...............................................................................................
39
List of Tables
Table 3-1. PWR-784EVM Electrical Performance Specifications................................................................................................
4
Table 8-1. Test Point Functions..................................................................................................................................................
10
Table 9-1. Key Factory Configuration Parameters.....................................................................................................................
11
Table 10-1. List of Test Points for Line and Load Measurements..............................................................................................
12
Table 10-2. List of Test Points for Efficiency Measurements......................................................................................................
12
Table 14-1. PWR784 List of Materials.......................................................................................................................................
40
Trademarks
PMBus
™
is a trademark of SMIF, Inc..
All trademarks are the property of their respective owners.
Trademarks
www.ti.com
2
TPS549D22 SWIFT™ Step-Down Converter Evaluation Module User's Guide
SLUUBG4A – JULY 2016 – REVISED AUGUST 2021
Submit Document Feedback
Copyright © 2021 Texas Instruments Incorporated