Quick Start List for Platform
2-4
Operation
Evaluation Module Preparations
Figure 2–2. Module Preparation
GND
RO/MO+
LO/MO–
SHUTDOWN
GND
C3
VDD
GND
GND
LIN
VDD
GND
GND
RIN
TPA0213 EVM Board
U1
+
TEXAS
INSTRUMENTS
2000
R4
R7
S1
R1
STEREO/MONO
C4
C5
R2
R8
C6
C1
C2
MIN
J3
J2
J1
R3
R6
R9
R5
SLOP266
SHUTDOWN
R13
R10
+
C8
C7
R12
R1
1
Table 2–4. Typical TPA0213 EVM Jumper Settings
EVM
J1
J2
TPA0213
ON
ON
Note:
ON = Shunt installed, OFF = Open
Power-Up
9) Verify correct voltage and input polarity and set the external power supply
to
ON. If V
CC
and an onboard regulator EVM are used to provide V
DD
, set
platform power switch S1 to
ON.
Platform LED2 should light indicating the presence of V
DD
, and the evaluation
modules installed on the platform should begin operation.
10) Adjust the signal source level or adjust potentiometers R4 and R8 on the
EVM as needed.
Summary of Contents for TPA0213
Page 1: ...October 2000 Mixed Signal Products User s Guide SLOU094...
Page 4: ...iv...
Page 6: ...vi...
Page 10: ...1 4 Introduction...