background image

 

December 2013 

 

 

 
 

CC2500EMK Quick Start Guide  

 

Opening the box and using the modules with SmartRF04EB 

 

1. Kit Contents 

 

 

 
2 x CC2500 Evaluation Modules 
2 x Antennas (Pulse W1010, 2 dBi) * 
Documentation 
 
The RF boards in this kit are FCC and IC certified 
and  they  are  tested  to  comply  with  ETSI/R&TTE 
over temperatures from 0 to +35°C. 
 
FCC/IC Regulatory Compliance 
FCC Part 15 Class A Compliant 
IC ICES-003 Class A Compliant 
 

(*) Picture may deviate! 

2. How to use the modules 

 
The  CC2500EM  boards  can  be  plugged  into 
several 

development 

boards 

from 

Texas 

Instruments.  Most  notably,  you  can  use  the 
SmartRF04EB, 

which 

is 

included 

in 

the 

CC2500DK.  This  board  lets  you  run  a  packet 
error  rate  (PER)  test,  control  the  device  from 
SmartRF™  Studio  and  it  can  be  used  as  a 
development platform. 
 
The board can also be plugged into the  SmartRF 
TrxEB 

(included 

in 

e.g. 

CC1120DK 

and 

CC1200DK)  and  the  MSP430  Expe

rimenter’s 

Boards. 
 
For  prototyping  with  other  microcontrollers,  plug 
the  EM  into  the  “SoC  Battery  Board” 
(

www.ti.com/tool/soc-bb

).  

 
This  guide  will  show  how  to  use  the  modules 
together with SmartRF04EB. 

 

3. Plug EM into SmartRF04EB 

 

 

 
Insert  a  CC2500EM  (EM)  with  an  antenna  into 
the  SmartRF04EB  (EB).  Connect  the  antenna 
firmly to the SMA connector on the EM. 
 

 

Caution! 

The 

kit 

contains 

ESD 

sensitive components. Handle with care 
to prevent permanent damage. 

 

4a. Power: Battery 

 

 

 

There  are  three  different  ways  of  applying  power 
to the EB: 
 
The  first method  involves  using    an  alkaline  non-
rechargeable  battery,  either  a  9V  or  a  4xAA 
battery  pack  connected  to  the  battery  connector 
on the bottom side of the board 
 

Warning! 

To  minimize  risk  of  personal  injury  or 

property  damage,  ONLY  use  alkaline  non-
rechargeable  batteries.  Never  use  rechargeable 
batteries to power the board.

 

4b. Power: DC/External 

 

 

 

The  second  method  applies  DC  power  using 

the  DC  input  jack  (right  in  picture,  centre  is  +, 
sleeve  is  ground),  or  by  connecting  a  4-10V 
voltage  source  between  the  4-10V  and  0V 
terminals  of  the  power  connector  (left  in 
picture).  It  is  also  possible  to  connect  a  3.3V 
voltage  source  between  the  3.3V  and  0V 
terminals.  The  on-board  voltage  regulators  will 
be bypassed in this case. 

 

External Power Supply

1

 Requirements: 

Nom Voltage: 6 VDC 
Max Current: 800 mA 
Efficiency Level V 

 

4c. Power: USB 

 

 

 

The  EB  can  also  be  powered  from  the  USB  bus. 
Make sure that the SmartRF

™ Studio software is 

installed  before  connecting  the  EB  to  the  PC; 
otherwise  you  may  experience  problems  in 
installing it later due to driver issues. 
 
Note  that  if  multiple  power  sources  are 
connected,  the  source  with  the  highest  voltage 
will power the  EB. 

This means that  you  should 

disconnect any attached battery when using a 
lab  supply  or  USB  power;  otherwise  the 
battery will be drained.

 

 

5. Set Power Switch 

 

 

 

If  a  3.3V  source  is  used  as  described  in  4b 
above,  the  switch  should  be  set  to  the  leftmost 
position.  For  all  other  cases,  the  switch  should 
be  set  to  the  rightmost  position.  This  switch  can 
be  used  to  turn  off  the  EB  by  switching  it  to  the 
opposite position of that used to turn it on 
 

Do  not  leave  the  board  powered  when 
unattended. 

 

6. Packet Error Rate Test 

 

 

 

When power is applied to the board, the PER test 
program will start. You should see the text shown 
above  on  the  LCD  display  on  both  evaluation 
boards.  
 
Press  the  button  marked  S1  (lower  right  corner) 
to continue.

 

7. Set Frequency Band

  

 

 

 

Select the desired frequency band of operation by 
using  the  joystick.  The  frequency  should  match 
the  evaluation  module  and  antenna  you  are 
using. 
 
Note  that  the  value  shown  in  the  display  is  also 
the  selected  value.  There  is  no  need  to  press  a 
button to select or activate the selection.

 

                                                      

1

 When using an external power supply, make sure it meets the listed requirements in addition to complying with applicable regional product regulatory and 

safety certification requirements such as UL, CSA, VDE, CCC, and PSE 

Reviews: