background image

DSG

1

CHG

2

VSS

3

SDA

4

SCL

5

TS1

6

CAP1

7

REGOUT

8

REGSRC

9

BAT

10

NC

11

VC5

12

VC4

13

VC3

14

VC2

15

VC1

16

VC0

17

SRP

18

SRN

19

ALERT

20

U1

BQ7692000PW

1µF

C1

100

R5

5

4

1
2
3

6

J1

395021006

1µF

C2

1µF

C3

1µF

C4

1µF

C5

1µF

C6

100

R4

100

R6

100

R7

100

R8

100

R9

4.7µF

C16

2.2µF

C13

1.25V

D2

J2

108-0740-001

0.001

R11

100

R10

100

R12

0.1µF

C8

0.1µF

C9

0.1µF

C7

TP10

DNP

TP12

DNP

TP15

DNP

TP8

DNP

TP21

DNP

TP17

TP20

DNP

TP23

DNP

30V

D3
SMBJ30A-13-F

DNP

100

R14

100

R24

100

R25

499k

R13

4

1
2
3

J8

22-05-3041

10.0k

R23

10.0k

R21

TP19

1
2

J5

PEC02SAAN

1
2

J4

PEC02SAAN

J3

108-0740-001

600V

D7
MUR860G

DNP

4

7,8

1,2,3

5,6,

30V

Q1
CSD17501Q5A

4

7,8

1,2,3

5,6,

30V

Q2
CSD17501Q5A

600V

D6
MURS360T3G

1.00Meg

R19

1.00Meg

R15

GND

GND

GND

GND

GND

J6

108-0740-001

J7

108-0740-001

0.1µF

C11

0.1µF

C12

0.1µF

C17

0.1µF

C18

1µF

C14

0

R16

1.00k

R17

1.00Meg

R18

-50V

Q3
BSS84W-7-F

16V

D5
MMSZ5246B-7-F

DNP

1.25V

D4

GND

10.0k Ω

R20

4700pF

C15

GND

GND

TP9

DNP

TP11

DNP

TP13

DNP

TP14

DNP

TP7

DNP

TP18

DNP

TP24

DNP

TP27

DNP

TP26

DNP

TP25

DNP

TP22

DNP

NT1

Net-Tie

BATT–

GND

BATT-

E2

E4

E3

E1

BATT–

1
2

3
4

S1

4-1437565-1

3.01k

R22

5.6V

D8

5.6V

D9

HS1

573300D00010G

DNP

TP3

TP4

TP5

TP6

TP1

DNP

TP2

DNP

TP29

DNP

TP28

DNP

GND

0

R2

DNP

0

R1

DNP

C5
C4
C3
C2
C1
C0

BAT R

SCL pull up

SDA pull up

BATT+

10.0k

R3

Input voltage 0 - 25 V

0 - 15 A

+

Output voltage 0 - 25 V

0 - 15 A

+

28V

D1
SMCJ28A

100

R26

100

R27

ALERT

470pF

C10

DNP

DSG

CHG

CAP1

SDA

SCL

REGOUT

C1

C0

C1

C2

C3

C4

C5

BATT+

BATT+

PFD

PACK–

I C

2

BOOT

TP16

bq76920EVM Circuit Module Physical Construction

www.ti.com

Figure 15

through

Figure 17

illustrate the schematics.

Figure 15. Schematic Diagram AFE

26

bq76920 Evaluation Module User's Guide

SLVU924B – March 2014 – Revised April 2014

Submit Documentation Feedback

Copyright © 2014, Texas Instruments Incorporated

Summary of Contents for bq76920

Page 1: ...n 2 1 3 bq76920 Circuit Module Performance Specification Summary 3 1 4 Required Equipment 3 2 bq76920 EVM Quick Start Guide 3 2 1 Before You Begin 3 2 2 Quick Start 4 3 bq76940 bq76930 bq76920 Softwar...

Page 2: ...pin connector Resistor cell simulator for quick setup with only a power supply PC software available for configuration 1 1 Kit Contents bq76920 circuit module Cable to connect the EVM to an EV2400 or...

Page 3: ...access to the internet TI bq76940 bq76930 bq76920 Evaluation Software see Section 3 Test leads to connect equipment Electronic load or assorted resistors Additional equipment may be desired to operat...

Page 4: ...d 5 Attach the interface board communication adapter to the PC using USB cable The EV2400 is recommended the EV2300 works if it is available and drivers are installed 6 Attach the interface board I2C...

Page 5: ...The examples in this document are from Windows 7 3 2 Installing the bq76940 bq76930 bq76920 Software Find the latest software version in the software section of the EVM tool folder http www ti com too...

Page 6: ...software Although the software runs without connection to a powered device it is recommended to have the device on when starting the software Follow the directions in the quick start section Figure 1...

Page 7: ...ar has the I2C address and a byte communication tool The I2C address must be entered the tool does not automatically detect the address The default address is 0x08 which is the default address for the...

Page 8: ...ster values may also be changed using the I2C byte write tool at the top of the window Register changes are visible if the Verify Writes option is enabled The display may also be updated using the Upd...

Page 9: ...hese value boxes are read only they are updated by the values read from the device with the Read Device button The Display raw data read from device below check box allows display of the hex register...

Page 10: ...ry Typical uses of a sequence might include Reading and clearing faults then enabling CHG and DSG outputs Setting ship mode Setting a balance pattern Any repetitive multiple register write used in eva...

Page 11: ...s resistors The top section of the S3 switch connects the BATT node to the top of the resistor string The bottom of the resistor string is connected to BATT The individual cell taps are connected to t...

Page 12: ...evaluation with reduced cells in a transient environment short the VCx pins at the capacitor or VCx test points and remove the unused input resistor When using the cell simulator shorting the unused c...

Page 13: ...witches if needed When the top and bottom cells are connected on the board 1 Connect BATT includes C0 2 Connect cells bottom up C1 C2 C3 3 Connect BATT includes top cell 4 Open the cell simulator swit...

Page 14: ...If it is useful to slow the transition the pattern C10 is available C10 should not be large in order to avoid current and slowing the edge to where the bq76920 would see the ALERT high as an input an...

Page 15: ...ough banana jacks Control connections are on the left top Pack terminals are on the right side using banana jacks Wide trace areas are used reducing voltage drops on the high current paths The EVM lay...

Page 16: ...Module Physical Construction www ti com Figure 8 Top Assembly 16 bq76920 Evaluation Module User s Guide SLVU924B March 2014 Revised April 2014 Submit Documentation Feedback Copyright 2014 Texas Instru...

Page 17: ...0EVM Circuit Module Physical Construction Figure 9 Top Layer 17 SLVU924B March 2014 Revised April 2014 bq76920 Evaluation Module User s Guide Submit Documentation Feedback Copyright 2014 Texas Instrum...

Page 18: ...t Module Physical Construction www ti com Figure 10 Layer 2 18 bq76920 Evaluation Module User s Guide SLVU924B March 2014 Revised April 2014 Submit Documentation Feedback Copyright 2014 Texas Instrume...

Page 19: ...0EVM Circuit Module Physical Construction Figure 11 Layer 3 19 SLVU924B March 2014 Revised April 2014 bq76920 Evaluation Module User s Guide Submit Documentation Feedback Copyright 2014 Texas Instrume...

Page 20: ...Module Physical Construction www ti com Figure 12 Bottom Layer 20 bq76920 Evaluation Module User s Guide SLVU924B March 2014 Revised April 2014 Submit Documentation Feedback Copyright 2014 Texas Instr...

Page 21: ...Circuit Module Physical Construction Figure 13 Bottom Silk Screen 21 SLVU924B March 2014 Revised April 2014 bq76920 Evaluation Module User s Guide Submit Documentation Feedback Copyright 2014 Texas In...

Page 22: ...dule Physical Construction www ti com Figure 14 Bottom Assembly 22 bq76920 Evaluation Module User s Guide SLVU924B March 2014 Revised April 2014 Submit Documentation Feedback Copyright 2014 Texas Inst...

Page 23: ...off Hex 0 5 L 4 40 Nylon Standoff 1902C Keystone J1 1 Receptacle 3 5mm 6x1 R A TH Header 6x1 R A 395021006 Molex J2 J3 J6 J7 4 Standard Banana Jack Uninsulated 15A Banana Jack 108 0740 001 Emerson Net...

Page 24: ...BK G Samtec J12 3 SH J12 5 SH J12 7 SH J12 9 SH J13 3 TP3 TP4 TP5 TP6 4 Black Test Point TH Multipurpose Black Keystone5011 5011 Keystone U1 1 C Controlled AFE Family for 5 10 15 Series Cell Lithium I...

Page 25: ...ber MFG TP2 TP29 0 Red Test Point TH Multipurpose Red Keystone5010 5010 Keystone TP7 TP8 TP9 TP10 TP11 TP12 0 White Test Point TH Multipurpose White Keystone5012 5012 Keystone TP13 TP14 TP15 TP18 TP20...

Page 26: ...12 0 1 F C17 0 1 F C18 1 F C14 0 R16 1 00k R17 1 00Meg R18 50V Q3 BSS84W 7 F 16V D5 MMSZ5246B 7 F DNP 1 25V D4 GND 10 0k t R20 4700pF C15 GND GND TP9 DNP TP11 DNP TP13 DNP TP14 DNP TP7 DNP TP18 DNP TP...

Page 27: ...ND ALT 16 17 Addr select GG_PWR GG_SCL GG_SDA GG_ALERT GG_ KEYIN GG_ PRES SMBA 16V D13 MMSZ5246B 7 F 5 6V D11 5 6V D10 5 6V D20 5 6V D19 TP37 TP33 DNP KEYIN PRES 1 2 3 4 5 6 7 8 9 10 J12 PEC05DAAN GND...

Page 28: ...6 J15 DNP BATT Test points BATT C5 C4 C3 C2 C1 C0 1 00k R64 bq76920EVM Circuit Module Physical Construction www ti com Figure 17 Schematic Diagram Cell Simulator 28 bq76920 Evaluation Module User s G...

Page 29: ...bq76920 Evaluation Software in step one of the Quick Start section and globally throughout document 4 Added clarification about device identifiers in menus or windows in the bq76940 bq76930 bq76920 S...

Page 30: ...dling and use of EVMs and if applicable compliance in all respects with such laws and regulations 10 User has sole responsibility to ensure the safety of any activities to be conducted by it and its e...

Page 31: ...his equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Opera...

Page 32: ...age et ayant un gain admissible maximal et l imp dance requise pour chaque type d antenne Les types d antenne non inclus dans cette liste ou dont le gain est sup rieur au gain maximal indiqu sont stri...

Page 33: ...sponsible for compliance with all legal regulatory and safety related requirements concerning its products and any use of TI components in its applications notwithstanding any applications related inf...

Page 34: ...Mouser Electronics Authorized Distributor Click to View Pricing Inventory Delivery Lifecycle Information Texas Instruments BQ76920EVM...

Reviews: