background image

 

Requirements

 

 
Electrical Requirements – 120v A.C. / 60 Cycle 
Power Consumption – 5 Amps 
 
 

Installation

 

 

1.

 

Set machine on a stable working bench or table. 

2.

 

Use the two mounting holes located on the base of the machine to bolt machine down. 
(Optional) 

3.

 

Plug in electrical cord to properly fused and grounded receptacle. 

 
 

Operation

 

 

1.

 

Flip power switch located on lower right side of machine to “ON”.  Green light on 
control panel indicates power is “ON”. 

2.

 

Set top platen temperature control located at the center of control panel to desired 
setting.  Allow 10 minutes for platen to heat up.  While platen is heating the 
corresponding red light on the control panel will remain on.  When platen reaches 
desired temperature the red light will turn off momentarily.  As the temperature 
controllers phase on and off to maintain desired platen temperature, the red light will 
also phase on and off.  The temperature to the platen can be turned off by turning knob 
counterclockwise until it clicks. 

3.

 

Set Timer Control located on the left of control panel to desired cycle dwell time.  This 
time setting will repeat each press cycle until changed. 

4.

 

To actuate press, pull handle down until platen locks in the down position.  When press 
cycle is complete, the buzzer will sound, alerting the operator to lift the top head up to 
the open position. 

5.

 

To immediately stop a cycle, lift the handle up to the open position during the cycle 
time. 

 
 

Maintenance

 

 

 

Check teflon and sponge to ensure good working order. 

 

Check spring tension and adjust as needed. 

 

 

Reviews: