Page 14 of 22
ELECTRICAL WIRING
1) Connect the 4-pins cable sockets from Power Supply box to Main Control Board box.
2) Connect the 2-pins cable sockets from Power Supply box to Heat Bed connector.
3) Connect the 2-pins white thermistor cable from Sbase TH2 to Heat Bed.
All manuals and user guides at all-guides.com
Summary of Contents for LITTLE MONSTER
Page 3: ...Page 3 of 22 BAG A 10 Pre Assembled X 3 All manuals and user guides at all guides com...
Page 6: ...Page 6 of 22 X 3 X 3 All manuals and user guides at all guides com a l l g u i d e s c o m...
Page 7: ...Page 7 of 22 BAG A 2 1 Pre Assembled X 3 All manuals and user guides at all guides com...
Page 10: ...Page 10 of 22 BAG A 1 M5 x 8mm 4 All manuals and user guides at all guides com...
Page 19: ...Page 19 of 22 REPETIER HOST SETUP All manuals and user guides at all guides com...
Page 20: ...Page 20 of 22 All manuals and user guides at all guides com...