Also refer to the operating instructions of the
manufacturer found in the appendix of the
machine file.
Interval
Maintenance work
Personnel
After the first 25
hours of operation
Change engine oil
Qualified
personnel
Check valve play and adjust (not on models with
automatic valve play equalisation)
Qualified
personnel
Check bolt connections
Qualified
personnel
Every 8 to 15 oper-
ating hours or prior to
the daily start of work
Check oil level
Trained
people
Check lower part of the oil bath air filter for correct
oil level and contamination, if required replace dirty
oil
Trained
people
On models with cyclones, empty the dust collection
container.
Trained
people
Check the intake area of the combustion and
cooling air.
Trained
people
Check the air filter maintenance display
Trained
people
Check the water precipitator
Trained
people
Every 250 operating
hours or every 12
month (whichever
occurs first)
Change engine oil
Qualified
personnel
Every 250 hours of
operation
Maintenance of the oil bath air filter
Qualified
personnel
Check valve play and adjust (not on models with
automatic valve play equalisation)
Qualified
personnel
Clean the cooling air area
Trained
people
Check bolt connections
Qualified
personnel
Clean the exhaust sieve
Qualified
personnel
Every 500 hours of
operation
Replace the fuel filter
Qualified
personnel
Hatz-Diesel 1B30 (optional)
Maintenance
13.02.2013
Aerial access platform Leo15GT 2012
107
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...