background image

Note: If installing a Neurio meter and additional CTs, connect the 
Neurio over Wi-Fi to update

See the 

Installation Manual

 for a detailed overview of metering, system 

wiring diagrams with meter placement, and instructions for installing a 
remote Neurio meter.

18

CLOSE WIRING COMPARTMENTS AND POWER ON

19

AND / OR

17

HOMEOWNER NETWORK

CONNECT BACKUP GATEWAY TO THE INTERNET

HOMEOWNER PASSWORD

16

INSTALL SOLAR METERING

1

2

INSTALL REMOTE SITE METERING

(Required for Home Loads upstream of Gateway)

1

2

Ethernet

2.4 GHz / 5GHz Wi-Fi

Summary of Contents for Powerwall

Page 1: ...s and Generation Main Neutral Terminals Load Generation Neutral Terminals Neutral Ground Bonding Strap Non Backup Loads Optional Internal Panelboard SYSTEM WIRING CONFIGURATIONS Backup Gateway With In...

Page 2: ...ations Backup Loads Non Backup Loads High Demand Loads LEGEND REQUIRED TOOLS MOUNT POWERWALL SUGGESTED TOOLS 1 4 5 16 7 16 3 16 Material Minimum Embedment Wood Studs 2 1 2 Plywood 1 4 beyond back of p...

Page 3: ...SIDE CABLE ENTRY REAR CABLE ENTRY CLICK 4 5 MOUNT THE BACKUP GATEWAY 6 7 BOTTOM REAR OR SIDE CABLE ENTRY OPTIONAL TOP CABLE ENTRY VIA CONDUIT HUB KIT x4 included Sealing washers must be installed...

Page 4: ...BONDING STRAP YES GATEWAY IS INSTALLED AS SERVICE EQUIPMENT INSTALL MAIN BREAKER See Wiring Reference in the Installation Reference Manual for breaker types MAKE BACKUP GATEWAY AC POWER CONNECTIONS 9...

Page 5: ...P PANEL CONDUCTORS 1 275 in lbs 120 in lbs 5 16 3 16 6 AWG 250 kcmil 6 AWG 250 kcmil 6 AWG 250 kcmil 14 AWG 2 0 1 275 in lbs 120 in lbs 5 16 3 16 6 AWG 250 kcmil 14 AWG 2 0 14 AWG 2 AWG 14 AWG 2 AWG O...

Page 6: ...OR 13 12 MAKE POWERWALL AC POWER CONNECTIONS INSTALL BREAKER HOLD DOWN BACKUP INTERNAL PANELBOARD NON BACKUP INTERNAL PANELBOARD 11 7 16 10 8 AWG 10 8 AWG 10 8 AWG...

Page 7: ...Drain CN Ground CN 12 V GND MULTI POWERWALL COMMUNICATION WIRING CONNECT COMMUNICATION WIRING 14 3 8 in 18 16 AWG 24 16 AWG 18 16 AWG 24 16 AWG...

Page 8: ...G OVERVIEW Correct Metering Installation LABEL CT ORIENTATION CT Label Source of Power Incorrect Metering Installation Power Flow Power Flow INSTALL OPTIONAL REMOTE DISABLE SWITCH 15 See Install Optio...

Page 9: ...tem wiring diagrams with meter placement and instructions for installing a remote Neurio meter 18 CLOSE WIRING COMPARTMENTS AND POWER ON 19 AND OR 17 HOMEOWNER NETWORK CONNECT BACKUP GATEWAY TO THE IN...

Page 10: ...e Work in one browser tab only For security message Your connection is not private select Advanced and Proceed For Error Bad Credentials select FORGOT PASSWORD to reset password For Error Login Error...

Reviews: