Setting Up the Ground Control Unit (GCU)
54
RangePro RPX8-P User Manual
6 • Ground Control Station Setup
Setting Up the Ground Control Unit (GCU)
Verify that the GCU is fully charged as follows:
1.
Remove the GCU (see
) from the case (callout 7 in
Figure 30. GCU
An AC power outlet must be available to charge the ground control unit (GCU).
IMPORTANT
Summary of Contents for RangePro RPX8-P
Page 90: ...90 Chapter 12 Contacting TerraView for Support Chapter Contents Support Options 91...
Page 104: ...104 Appendix F LED Meanings Chapter Contents Introduction 105...
Page 119: ...119 Appendix K Configuration Specific Parameters Chapter Contents Load Specific Parameters 120...
Page 121: ...121 Appendix L Making Sense of Motor Tests Chapter Contents Making Sense of Motor Tests 122...
Page 123: ...123 Appendix M Serial Port Assignment Chapter Contents Serial Port Assignment 124...