-1
8
-
12
.
Data Reading/Deletion
In test mode, press
data reading, press
or
button for
more than
3 seconds
to enter
button to select reading data
n
umber by step value 1, press
or
button con
tinually
to
select
data
reading group number by step value 10. When the
current
data is earth resistance or soil resistivity, press “
SET
” button to
read data
value
rC
and
rP
and
button to exit from reading.
I
f there is no storage data, LCD will display “
- - - -
”, see
the above
figure
on right side
.
Under data reading status, press
button to enter data deletion,
press
or
to select “
NO
” or “
Y
ES
”, selecting
“
NO
and then pressing
“
CLR
” button for not deleting and return data reading status, selecting
“
Y
ES
” and then pressing “
CLR
” button for deleting stored data
---
it will
show as above right figure after deletion.
Notice
: Operating data deletion will delete all the stored data one-
time
and
cannot
be restored.
Be sure you want to delete stored data
.
13
.
Data Upload
Stored data can be retrieved via functions explained
above
and
easily
transferred to an optional
Interpolated
Data Transfer Spreadsheet
supplied by Terra Exploration
Group. The
Interpolated Data Transfer Spreadsheet
feeds seamlessly into the optional
Voxler Earth Imaging
Software
. The
Interpolated Data Transfer Spreadsheet
and
Voxler Earth Imaging Software
are available as a
package from
Terra Exploration Group. The Interpolated
Data Transfer Spreadsheet
provides the ability to view
Voxler
information in 2D or 3D modes.
VII. Battery Replacement
Do not replace batteries around flam
m
abl
e
products.
Do not replace batteries during
measurement
Pay attention to battery polarity and specification
.
do not
mix use of new and used batter
ies
to avoid damage
to
Tester
When the enclosure of Tester is wet, do not open battery
cover
Dispose of used batteries in an appropriate manner
.
1.
Switch off; mak
e
sure that the Tester is
in
switch
ed
-off state.
2.
Loosen the four screws on battery cover at the bottom of the
Tester, and
remove
battery cover.
3.
Install
new batter
ies
, pay
ing
attention to battery polarity
and
specification, close battery cover, and
re-
fasten screw
s
.
4.
Switch on
Tester for
verification
and operate normally
.