background image

581-706 5” OD Arch Post Swing 8’ 6 Seat

 

STEP #2: 

Remove swing hanger pendulums from the swing hanger assemblies.  Using 
S-hooks, attach seats to chain and chain to swing hanger pendulums.  
Close the S-hooks to within .034” (1/32”) using S-hook pliers. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

STEP #3: 

Assemble top portion of swing hangers on top rail following spacing on 
page 1 diagram. 
 

STEP #4: 
 
 
 

Footing holes may be marked out and dug from footing layout, however, 
it is easier to position swing in proper location, mark holes, move 
swing aside, and dig holes. 

STEP #5: 

Stand swing upright onto legs and brace in footing holes so that 2’ – 
3’ of pipe will be under intended level of resilient surfacing and top 
rail is at desired height. 
 

STEP #6: 

Plumb and level entire unit.  Tighten set screws by using short length 
of pipe on end of socket key to add leverage.  Pour concrete.  Crown 
surface.  Wait 48 hours before removing braces and using equipment. 
 

STEP #7: 

Attach assembled seats to swing hangers by reattaching the pendulums to 
the swing hangers.  Do not over tighten bolt on pendulum.  Hangers must 
move freely. 
 

STEP #8: 

Attach warning label and Manufacturer’s Identification label to a clean 
surface.  The labels should be attached in a location where they are 
clearly visible and legible and away from normal hand and foot 
placement areas.  The labels must be replaced if they become illegible, 
destroyed or removed.  Contact your SportsPlay distributor for 
replacements. 

 

 
 
 
 

 

 

Summary of Contents for 581-706

Page 1: ...they can possibly create dangerous situations leading to unnecessary accidents Resilient Surfacing should be used under all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy by calling 1 301 504 7908 PACKING LIST HARDWARE BAG 1 CTN Hardware Bag 12 585 521 3 ...

Page 2: ...es up to 2 3 8 diameter Varying soil climatic conditions may require deeper and heavier footings in some areas Check local building codes Detail Detail Permanent Installation Suggested Bracing Method IF RESILIENT SURFACING IS TO BE LESS THAN 12 THEN ADDITIONAL PIPE SHOULD BE PUT IN CONCRETE TO MAINTAIN PROPER FINISH GRADE FOR EQUIPMENT USE AREA AND FOOTING LAYOUT ...

Page 3: ...UCTIONS Check MONTHLY for loose bolts damaged or broken parts Tighten and or replace immediately On swings and any equipment that uses S hooks and or Swing Hangers check the bearing surfaces for wear Replace any parts that show a reduction of 25 from the original size ASSEMBLY AND INSTALLATION NOTE All threaded ends of bolts protruding beyond nuts must be cut off and or peened to eliminate sharp e...

Page 4: ...der intended level of resilient surfacing and top rail is at desired height STEP 6 Plumb and level entire unit Tighten set screws by using short length of pipe on end of socket key to add leverage Pour concrete Crown surface Wait 48 hours before removing braces and using equipment STEP 7 Attach assembled seats to swing hangers by reattaching the pendulums to the swing hangers Do not over tighten b...

Reviews: