background image

581-638 8’ Modern Bipod 6 Seat Swing

 
GENERAL USE/FALL ZONE & FOOTING RECOMMENDATIONS: 

 

 
Single Axis Swings: 
 

The Use/Fall Zone should extend to the front & rear, a minimum distance of 
twice the height of the Top Rail above the resilient surfacing material.  The 
Use/Fall Zone to the sides should follow the general recommendations of six 
feet minimum.  This six-foot zone may overlap that of an adjacent swing 

ructure. 

st

 
Rotating Swings: 
 

The Use/Fall Zone should extend in all directions the length of the swing 
chain plus six feet.  The six-foot minimum fall zone from the supporting 
structure also applies, and may overlap the six-foot zone of an adjacent 
swing structure. 
 

GENERAL MAINTENANCE INSTRUCTIONS: 

 

 
Check MONTHLY for loose bolts, damaged or broken parts.  Tighten and/or 
replace immediately.  On swings and any equipment that uses S-hooks and/or 
Swing Hangers check the bearing surfaces for wear.  Replace any parts that 
show a reduction of 25% from the original size. 
 

ASSEMBLY AND INSTALLATION: 

 

NOTE: 

All threaded ends of bolts protruding beyond nuts must be cut off and/or 
peened to eliminate sharp edges.  No more than two threads should extend 
beyond face of nut.  All washers, “T” nuts and other fastener hardware 
used on round pipe or tubing must be hammered down to conform to the 
curved underlying surface to eliminate catch points.  DO NOT tighten nuts 
more than hand-tight until entire assembly is completed. 
 

STEP #1: 

Assemble swing frame on side, on ground.  If more than one section, 
assemble section by section.  Layout parts so that when frame is erected, 
legs will be in approximately correct position. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for 581-638

Page 1: ...ssibly create dangerous situations leading to unnecessary accidents Resilient Surfacing should be used under all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy by calling 1 301 504 7908 PACKING LIST HARDWARE BAG 1 CTN Hardware Bag 12 585 520 2 3 8 Swing H...

Page 2: ... up to 2 3 8 diameter Varying soil climatic conditions may require deeper and heavier footings in some areas Check local building codes Diagram Diagram Permanent Installation Suggested Bracing Method IF RESILIENT SURFACING IS TO BE LESS THAN 12 THEN ADDITIONAL PIPE SHOULD BE PUT IN CONCRETE TO MAINTAIN PROPER FINISH GRADE FOR EQUIPMENT USE AREA AND FOOTING LAYOUT ...

Page 3: ... Check MONTHLY for loose bolts damaged or broken parts Tighten and or replace immediately On swings and any equipment that uses S hooks and or Swing Hangers check the bearing surfaces for wear Replace any parts that show a reduction of 25 from the original size ASSEMBLY AND INSTALLATION NOTE All threaded ends of bolts protruding beyond nuts must be cut off and or peened to eliminate sharp edges No...

Page 4: ...er intended level of resilient surfacing and top rail is at desired height STEP 6 Plumb and level entire unit Tighten set screws by using short length of pipe on end of socket key to add leverage Pour concrete Crown surface Wait 48 hours before removing braces and using equipment STEP 7 Attach assembled seats to swing hangers by reattaching the pendulums to the swing hangers Do not over tighten bo...

Reviews: