2.13 Placing into Operation
•
Every time before placing the machine into operation, perform a thorough
walk-around inspection of the machine.
•
Check the machine for loose pins, cracks, tears, wear, leaks and deliberate
damage.
•
Never place a damaged machine into operation.
•
Make any necessary repairs immediately, prior to resuming operation.
•
Close and lock all hoods and covers, then inspect to make sure all warning
signs are in place and legible.
•
Make sure all windows and mirrors are clean. Secure door and windows
against unintentional movements.
•
Make certain no one is working on or under the machine and warn any
persons standing nearby that the machine will be placed into operation.
•
Prior to placing the machine into operation, adjust the driver’s seat, mirrors,
and ventilation system settings (if equipped) so you can work in comfort
and safety.
2.14 Starting the Machine
•
Before starting, check all indicator lamps and instruments to make certain
they are working properly.
•
Start the engine in the manner described in the operating instructions.
•
Only allow the engine to run in enclosed rooms if there is adequate
ventilation. If necessary, open doors and windows to ensure a proper supply
of fresh air.
•
Bring the engine and hydraulic oil up to operating temperature. Low oil tem-
peratures can cause the control system to respond sluggishly.
•
Move the machine carefully to open ground and then check the functionality
of the lift arm and drive controls as well as the signal and lighting
equipment.
2 SAFETY
24
PT-50/60 US/ROW PT-50T AUS O&M
2030-778 2013-12
Summary of Contents for PT50T
Page 5: ...4 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 7: ...6 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 33: ...32 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 35: ...34 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 41: ...40 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 49: ...48 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 59: ...58 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 63: ...62 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 65: ...64 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 85: ...SERVICE LOG 84 Hours Service Performed Notes PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 86: ...Hours Service Performed Notes SERVICE LOG 85 PT 50 60 US ROW PT 50T AUS O M 2030 778 2013 12...
Page 87: ......