Tech-Tip 93
6
Released: 6/19/2019
Tech Tips
Step 3
Drive the unit into the dielectric testing area and
onto the insulating platforms (pads) centered
under the tires. Engage the park brake, place
the transmission in neutral and turn on the PTO.
Set the unit up for operation by deploying the
outriggers onto insulating platforms (pads)
centered under the outrigger foot, reference
Figure 1. Once outrigger setup is complete, shift
the outrigger/unit selector into the unit position.
The boom can be brought to the ground mount
position to aid in set-up during the next steps.
Figure 1