
Operator's Manual
Fifth Edition • First Printing
Inspections
14
Genie
®
Super Hoist
®
Part No. 1314197GT
Function Tests
1 Select a test area that is firm, level and free of
hazards.
Setup
2 Stand the machine up on its base. Release the
leg locks one at a time and lower each leg to
the down position.
3 Firmly grasp the cylinder assembly and lift it
enough for each leg to lock into the down
position.
Result: All four leg locks should click into the
locked position.
4 Position the platform over the mounting plug
and fasten it securely with the T-nut.
5 Set the CO2 tank bracket next to the
CO2 tank. Wrap the straps around the tank
and attach the tank tightly to the bracket. Set
the CO2 tank bracket with the tank on any one
of the hoist legs.
Note: Leave the tank on the bracket until it is
necessary to change tanks.
6 Spin the pressure regulator connecting nut
onto the CO2 tank valve stem and hand
tighten. It is not necessary to use a wrench.
Tip-over hazard. The pressure
regulator operating pressure is
preset for the maximum load
capacity of the machine.
Modifying or using any other
pressure regulator or
compressor in excess of
600 kPa / 90 psi service could
result in death or serious injury.
Use only Genie approved
replacement parts.
7 Connect the hose and hand control by
inserting the hose plug end into the coupling
on the side of the pressure regulator. Connect
the hand control hose to the valve at the base
of the cylinder assembly.
8 Open the CO2 tank valve slowly by turning the
handle counterclockwise.
Component damage hazard. If
the CO2 tank valve is opened
quickly, the pressure regulator
diaphragm could be damaged.
Summary of Contents for Genie Super Hoist
Page 27: ......