![Terex Genie Lift Guard S-60 Service Manual Download Page 74](http://html.mh-extra.com/html/terex/genie-lift-guard-s-60/genie-lift-guard-s-60_service-manual_1088632074.webp)
Service Manual
February 2015
Checklist B Procedures
52
S-
60 • S
-
65 • S
-
60 TRAX • S
-
65 TRAX • S
-
60 HC • S
-
60X • S
-60XC Part No. 825591
B-15 T est the Driv e Brak es
B-15
Test the Drive Brakes
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper brake action is essential to safe machine
operation. The drive brake function should operate
smoothly, free of hesitation, jerking and unusual
noise. Hydraulically-released individual wheel
brakes can appear to operate normally when they
are actually not fully operational.
Collision hazard. Be sure that the
machine is not in free-wheel or
partial free-wheel configuration.
Refer to maintenance procedure,
Confirm the Proper Brake
Configuration
.
Note: Select a test area that is firm, level and free
of obstructions.
1
Mark a test line on the ground for reference.
2
Start the engine from the platform controls.
3
Move the engine idle control switch to foot
switch activated high idle (rabbit and foot
switch symbol), then lower the boom into the
stowed position.
4
Choose a point on the machine (i.e., contact
patch of a tire) as a visual reference for use
when crossing the test line.
5
Bring the machine to top drive speed before
reaching the test line. Release the drive
joystick when your reference point on the
machine crosses the test line.
6
Measure the distance between the test line
and your machine reference point. Refer to
Specifications,
Performance Specifications
.
Note: The brakes must be able to hold the
machine on any slope it is able to climb.
B-16 T est the Driv e Speed - St ow ed Positi on
B-16
Test the Drive Speed – Stowed
Position
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper drive functions are essential to safe
machine operation. The drive function should
respond quickly and smoothly to operator control.
Drive performance should also be free of hesitation,
jerking and unusual noise over the entire
proportionally controlled speed range.
Note: Select a test area that is firm, level and free
of obstructions.
1
Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
2
Start the engine from the platform controls.
3
Move the engine idle select switch to foot
switch activated high idle (rabbit and foot
switch symbol).
4
Lower the boom to the stowed position.
5
Choose a point on the machine; i.e., contact
patch of a tire, as a visual reference for use
when crossing the start and finish lines.
6
Bring the machine to top drive speed before
reaching the start line. Begin timing when your
reference point on the machine crosses the
start line.
7
Continue at full speed and note the time when
the machine reference point crosses the finish
line. Refer to Specifications,
Performance
Specifications
.
Summary of Contents for Genie Lift Guard S-60
Page 238: ...Service Manual February 2015 216 Deutz D 2 9 L4 Engine Wire Harness ...
Page 239: ...February 2015 Service Manual 217 Perkins 404F 22 Engine Wire Harness ...
Page 243: ...February 2015 Service Manual 221 Electrical Schematic Options Deutz D 2 9 L4 ...
Page 246: ...Service Manual February 2015 224 Electrical Schematic Options Perkins 404F 22 ...
Page 247: ...February 2015 Service Manual 225 Wiring Diagram 3kW Hydraulic Generator ...
Page 250: ...Service Manual February 2015 228 Wiring Diagram 12kW Hydraulic Generator Welder Option ...
Page 251: ...February 2015 Service Manual 229 Electrical Schematic 12kW Hydraulic Generator Welder Option ...
Page 254: ...Service Manual February 2015 232 Hydraulic Schematic 12kW Hydraulic Generator Welder Option ...
Page 255: ...February 2015 Service Manual 233 Hydraulic Schematics Hydraulic Schematic 2WD Models ...
Page 258: ...Service Manual February 2015 236 Hydraulic Schematic 4WD Models ...
Page 262: ...Service Manual February 2015 240 Electrical Schematic Ford MSG 425 EFI Models ANSI CSA ...
Page 271: ...February 2015 Service Manual 249 Electrical Schematic Deutz D2011L03i Models ANSI CSA ...
Page 274: ...Service Manual February 2015 252 Electrical Schematic Deutz D2011L03i Models ANSI CSA ...
Page 275: ...February 2015 Service Manual 253 Electrical Schematic Deutz TD2011L04i Models ANSI CSA ...
Page 278: ...Service Manual February 2015 256 Electrical Schematic Deutz TD2011L04i Models ANSI CSA ...
Page 287: ...February 2015 Service Manual 265 Electrical Schematic Deutz D 2 9 L4 Models ANSI CSA ...
Page 290: ...Service Manual February 2015 268 Electrical Schematic Deutz D 2 9 L4 Models ANSI CSA ...
Page 299: ...February 2015 Service Manual 277 Electrical Schematic Perkins 404D 22 Models ANSI CSA ...
Page 302: ...Service Manual February 2015 280 Electrical Schematic Perkins 404D 22 Models ANSI CSA ...
Page 311: ...February 2015 Service Manual 289 Electrical Schematic Perkins 404F 22 Models ANSI CSA ...
Page 314: ...Service Manual February 2015 292 Electrical Schematic Perkins 404F 22 Models ANSI CSA ...
Page 390: ...Service Manual February 2015 368 Electrical Schematic Ford MSG 425 EFI Models CE ...
Page 399: ...February 2015 Service Manual 377 Electrical Schematic Deutz D2011L03i Models CE ...
Page 402: ...Service Manual February 2015 380 Electrical Schematic Deutz D2011L03i Models CE ...
Page 403: ...February 2015 Service Manual 381 Electrical Schematic Deutz TD2011L04i Models CE ...
Page 406: ...Service Manual February 2015 384 Electrical Schematic Deutz TD2011L04i Models CE ...
Page 415: ...February 2015 Service Manual 393 Electrical Schematic Perkins 404D 22 Models CE ...
Page 418: ...Service Manual February 2015 396 Electrical Schematic Perkins 404D 22 Models CE ...
Page 427: ...February 2015 Service Manual 405 Electrical Schematic S 60 HC CE ...
Page 430: ...Service Manual February 2015 408 Chassis Wiring Diagram S 60 HC CE ...
Page 431: ...February 2015 Service Manual 409 Ground Control Box Terminal Strip Wiring Diagram S 60 HC CE ...
Page 434: ...Service Manual February 2015 412 Platform Control Box Wiring Diagram S 60 HC CE ...
Page 438: ...Service Manual February 2015 416 Electrical Schematic Ford MSG 425 EFI Models AS ...
Page 447: ...February 2015 Service Manual 425 Electrical Schematic Deutz D2011L03i Models AS ...
Page 450: ...Service Manual February 2015 428 Electrical Schematic Deutz D2011L03i Models AS ...
Page 451: ...February 2015 Service Manual 429 Electrical Schematic Deutz TD2011L04i Models AS ...
Page 454: ...Service Manual February 2015 432 Electrical Schematic Deutz TD2011L04i Models AS ...
Page 463: ...February 2015 Service Manual 441 Electrical Schematic Perkins 404D 22 Models AS ...
Page 466: ...Service Manual February 2015 444 Electrical Schematic Perkins 404D 22 Models AS ...
Page 475: ......