March 2022
Maintenance Manual
Programmed Maintenance Procedures
Part No. 1268489GT
S
®
Booms • Z
®
Booms
175
7 Remove the shims.
8 Gently pry the outer ring out of the hub.
9 Pull the hub off of the spindle. The outer
bearing should fall loose from the hub.
10 Place the hub on a flat surface and gently pry
the inner oil seal out of the hub. Remove the
inner bearing.
11 Pack both bearings with clean, fresh grease.
12 Place the large inner bearing into the rear of
the hub.
13 Install a new inner oil seal into the hub by
pressing it evenly into the hub until it is flush.
14 Slide the hub onto the spindle.
Component damage hazard. Do
not apply excessive force or
damage to the lip of the seal
may occur.
15 Place the outer bearing into the hub.
16 Install the outer ring.
17 Install the shims.
18 Install the cover and torque the retaining
fastener to 383 ft-lbs / 519 Nm.
19 Install the tire and wheel assembly. Torque
the wheel lug nuts to specification. Refer to
Specifications,
Machine Specifications
.
P3-1
Perform Engine Maintenance –
3000 Hours
Engine specifications require that this procedure
be performed every 3000 hours.
Required maintenance procedures and additional
engine information are available in the
manufacturer's manuals. Refer to Specifications,
Engine Operator and Maintenance Manuals
.
Deutz Models
D 2011, TD 2011
•
Toothed belt - replace
•
Injection valve- replace
•
Charge air cooler - clean
•
Turbocharger compressor outlet- clean
•
V-belt and tensioning pulley - replace
TD 2.2 L3, TCD 2.2 L3, D 2.9 L4, TD 2.9 L4
•
V-belt and tensioning pulley - replace
Ford Models
•
Coolant filler cap - clean/replace
Summary of Contents for Genie Lift Guard S-40
Page 198: ......