
10
Fig. 9
4.3 Installation of a metal rail with a drive
STEP 1
Fasten the drive to the rail with two U-shaped handles. Fasten the handles with the 6 mm
nuts included in the set (Fig. 9).
STEP 2
Place the rail with a drive on the garage floor, in the middle of the gate. The side without
the drive should be at the gate. Lift and place the front of the rail in the wall bracket.
Insert the spindle and secure it with the cotter (Fig. 9).
STEP 3
Lift the rail with the drive so that it is position will be horizontal and in the center of the
gate. Mount the drive rail to the ceiling with mounting brackets (Fig. 9, Fig. 10).
STEP 4
Connect with screws the straight arm with the bented arm.
Place and screw the arms to the gate handle located on the upper edge of the gate, using
the screws included in the set (Fig. 9, Fig. 11).
Do not let children stay near a gate, drive or ladder. It can cause serious
injuries and / or damage.