ASSEMBLY OF STEEL SHELVING
Tools Needed:
A rubber mallet for seating the shelf supports into the uprights.
Two people are recommended for assembly. Approximate assembly time: 20-30 minutes per section.
5.
Finish installing the remaining left-to-right shelf supports
and front-to-back shelf supports around the top of the unit.
1.
The reference numbers used throughout this sheet refer to
the illustration on the back cover. This is to help you to
identify the various parts as they are mentioned.
2.
Create a unit end by connecting two uprights (Ref. No. 1
or 2) with one of the front-to-back shelf supports (Ref.No.
3) by inserting the shelf support rivets into the bottom
two keyhole slots of each upright using a rubber mallet to
seat the upright securely in the keyhole slots.
NOTE: Be sure that the narrow
end of the keyhole slots are
pointing downward, and the flat
edge of the shelf support is
facing up.
3.
Assemble another unit end by repeating the directions in step 2.
Be sure the shelf support rivets are seated in the bottom of
the slots. If you are creating a starter unit and adder units then
you will need to replace the EUR upright post on one end with
ZTP upright posts.
4.
Connect two of the left-to-right shelf supports
(Ref. No. 4) between the two assemblies, one
on each side with angled corners facing
toward each other. Be sure to use
the two keyhole slots
nearest the floor, as
in step 1.
NOTE: As in step one,
make sure the flat
edge of the shelf
supports are facing
upwards. If this has
been done correctly,
there would now be
a flat surface around
all four edges on which to
lay the bottom steel shelf.
If any edges have an upward facing angled edge, the
support has been inserted upside down.
NOTE: Be sure that the support
rivets are seated in the bottom
of the slots of the uprights securly.