6
installation guide
STEP 1
STEP 4
STEP 5
STEP 6
STEP 2
Always use two people when setting up the base.
Place the bed base box in a desired location with the bottom of
the box facing up.
Remove the binding straps and packing materials, making sure
not to puncture the box with any sharp objects.
Remove the bed base from
the box. Unfold the bed
making sure to keep the
bottom of the bed facing
upwards.
STEP 3
Uncoil input Power Cord (connected to
Control Box’s power port) and plug into
Power Supply.
To sync two bases see detailed installation
instructions on pages 10-11.
To install Headboard Brackets (sold separately)
see instructions on page 12.
It is recommended to leave the battery backup strap attached
to the power supply for use when needed. 2 9V batteries (not
included) will be required for its use.
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure
that the Power Supply and all attached
cords are directed toward the desired
surge protector.
For customer support, call Customer Service: U.S. 1-800-499-1965 | Canada 1-800-268-4414
Legs are shipped fully assembled. Alternative heights in 3"
increments can be achieved by removing leg segments.
To install the legs, thread the leg into frame, and tighten by hand.
Do not over tighten.
Summary of Contents for EASE
Page 54: ...50 notes ...
Page 55: ...51 notes ...
Page 56: ... 2019 Tempur Sealy International V006_07 2020 ...