The hot water coil is designed for a maximum
working pressure of 250 psig.
•
The unit can be ordered with a 3-way
modulating valve shipped loose from the
factory to be installed in the field. See the
submittal package for the valve part number
and specifications.
•
Piping to and from the hot water coil must be
field supplied and installed. This includes the
strainer, pipes, and pipe fittings. See Figure
•
Piping locations can also be found in the
submittal data.
•
A field provided and installed valve can also
be used as long as the valve matches the
specifications/ratings of the factory installed
valve.
•
Connect the modulating valve to the customer
terminal board using the hot water/steam
heating valve output (HTGV-O) at terminal
Figure 37: Hot water/steam heating valve output
Figure 38: Hot water piping schematic
Figure 39: Steam piping schematic