Mounting instructions for TQ12 ver 2 Production tracker
- Installation for collecting positioning and production data
This scenario should be used when the unit shall collect the machine's running and production hours, and alarms. When the main switch is
turned off the unit has limited possibility to send data. The unit is equipped with a back-up battery, fully charged and in good condition it
can send positions for some hours after the main power switch is turned off. In this scenario, the unit draws no power from the battery
when the main power switch is turned off.
●
Red
wire connects to b at a suitable location, after the main switch. Use a 2 or 3 A fuse to protect the unit. The power must be
constant when machine is running
●
Black
wire is connected to ground.
●
Yellow
wire is connected to the signal when the engine is turned on, such as the ignition. The signal should be 7.5-30 VDC.
●
Optional,
White/Green
wire is connected to the signal that is high when the machine produces. The signal should be 2.5-30 VDC.
●
Optional,
White
wire is connected to the alarm (2.5-30 VDC).
●
The other wires are used for TelliQ accessories.
Page
6 (8)