Mounting instructions for TQ12 ver 2

Patrik Abrahamsson

2018-04-24

TQ-18-196

Production tracker

Reviewed by 

Joel Verpers

 

TQ12 ver 2 Production tracker

 

Mounting instruction

 
 

 

 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 

 

Contact TelliQ Customer Center after each installation for function 

control and configuration of the unit in the TelliQ web-system. 

+46 589 123 70 

 

 

Page​ 

1 (8)

 

 

Summary of Contents for TQ12 ver 2

Page 1: ...ahamsson 2018 04 24 TQ 18 196 2 Production tracker Reviewed by Joel Verpers TQ12 ver 2 Production tracker Mounting instruction Contact TelliQ Customer Center after each installation for function contr...

Page 2: ...he following scenarios Main power switch on negative side main power switch is located on the machine negative side o Installation for collecting positioning and production data running hours etc Main...

Page 3: ...or some hours after the main power switch is turned off In this scenario the unit draws no power from the battery when the main power switch is turned off Red wire connects to battery at a suitable lo...

Page 4: ...led as described below without relay running and production hours will be counted when the main switch is off and provide incorrect data in the TelliQ system and increase the power consumption of the...

Page 5: ...ion after the main switch has been turned off Red wire connects to battery at a suitable location before the main switch Use a 2 or 3 A fuse to protect the unit The power must be constant when machine...

Page 6: ...off In this scenario the unit draws no power from the battery when the main power switch is turned off Red wire connects to battery at a suitable location after the main switch Use a 2 or 3 A fuse to...

Page 7: ...is in deep sleep mode Off Causes GNSS module is short circuited Unit is powerless Device is not working or Unit firmware is being flashed It can take up to 5 minutes before the unit has a connection...

Page 8: ...ORANGE DOUT1 N A in standard application VIOLET DOUT2 N A in standard application GREEN 1WIRE DATA N A in standard application BLUE 1WIRE POWER N A in standard application GSM Quad band module with in...