![Telenetics Corporation FT100 S Installation And Operation Manual Download Page 16](http://html1.mh-extra.com/html/telenetics-corporation/ft100-s/ft100-s_installation-and-operation-manual_1082085016.webp)
Installation
2-2
FT 100S
SITE PREPARATION
The installation area should be clean, well-lighted, and free from
extremes of temperature, humidity, appreciable shock, and vibration.
Allow sufficient space at the rear of the unit for cable clearance and air
flow. See Figure 2-1.
Figure 2-1
Installation
Control
Terminal Cable
RJ48C
Jack
DTE
Cable
115 VAC
60 HZ
1/8 AMP
NWK
FUS
E
FU
SE
F
U
S
E
3/16
AMP S.B.
250 VAC
PORT 1
DTE Connector
CONTROL
Port
CONTROL
Summary of Contents for FT100 S
Page 10: ...ESF Framing C 4 Framing Format Conversion C 6 Performance Monitoring C 6 Service and Support...
Page 22: ...Installation 2 8 FT 100S...
Page 28: ...Hardware Configuration 3 6 FT100S...
Page 106: ...Control Port Operation 6 28 FT 100S...
Page 108: ...Maintenance 7 2 FT 100S...
Page 116: ...Specifications A 4 FT 100S...
Page 120: ...Control Port Command Quick Reference B 4 FT 100S...
Page 128: ...T1 Overview C 8 FT 100S...