TELELYNX LAVISION-8811 Manual Download Page 20

 

16 

 

Chapter 4 Troubleshooting 

ISO9001  quality  assurance  system  has  been  approved  by  CQC  organization.  For 

guarantee  the  products’  quality,  reliability  and  stability.  All  products  have  been 

passed the testing and inspection before ship out factory. The testing and inspection 

scheme already cover all the Optical, Electronic and Mechanical criteria which have 

been  published.  To  prevent  potential  hazard,  please  strictly  follow  the  operation 

conditions. 

Prevention Measure 

  Installing the device at the place in which environment temperature between 0 to 

45 °C 

  Making  sure  good  ventilation  for  the  heat-sink  on  the  rear  panel  and  other 

heat-sink bores if necessary 

  Checking the input AC within the power supply working range and the connection 

is correct before switching on device 

  Checking the RF output level varies within tolerant range if it is necessary 

  Checking all signal cables have been properly connected 

  Frequently  switching  on/off  device  is  prohibited;  the  interval  between  every 

switching on/off must greater than 10 seconds. 

Conditions need to unplug power cord 

  Power cord or socket damaged. 

  Any liquid flowed into device. 

  Any stuff causes circuit short 

  Device in damp environment 

  Device was suffered from physical damage 

  Longtime idle. 

  After switching on and restoring to factory setting, device still cannot work properly. 

Summary of Contents for LAVISION-8811

Page 1: ...LAVISION 8811 ...

Page 2: ...llow the methods procedures and constraints introduced by this manual while operating the device while the manual is for reference only the functionality and UI shall be subject to the real products After purchasing of our devices please leave your contact details to our customer service staff We will track the usage of the device randomly and inform you while there is a new version of software av...

Page 3: ...d rapid and frequent power on off or it may cause damages to the semiconductor chipsets Keep proper direction of the power cord when plug into or out from a power socket Connect the grounding pole and signal cable before connecting the power cord Do not touch the power socket with wet hands to avoid electric shocks Take off all jewelry or ornaments such as ring necklaces watches bracelets etc befo...

Page 4: ...LATION GUIDE 4 2 1 GENERAL PRECAUTIONS 4 2 2 POWER PRECAUTIONS 4 2 3 DEVICE S INSTALLATION FLOW CHART ILLUSTRATED AS FOLLOWING 4 2 4 ENVIRONMENT REQUIREMENT 4 2 5 GROUNDING REQUIREMENT 5 CHAPTER 3 WEB NMS OPERATION 6 4 1 ENCODER LOGIN 6 4 2 ENCODER OPERATION 7 CHAPTER 4 TROUBLESHOOTING 16 CHAPTER 5 PACKING LIST 17 ...

Page 5: ...device supports ASI Gigabit IP input and output With its wide range of encoding tools and excellent video quality HEVC offers incredible compression efficiency making live UHD 4K delivery available for satellite cable terrestrial fiber networks and digital television broadcasting systems 1 2 Key Features 2 channels HDMI 2 0 interface for 1 channel input with 1 port for backup Embedded hardware cod...

Page 6: ..._25P 1920 1080_24P RGB YCbCr 4 4 4 YCbCr 4 2 2 YCbCr 4 2 0 2160P_50 60Hz only Video Encoding Encoding H 265 HEVC H 264 AVC Chroma 4 2 2 4 2 0 Bit rate 1Mbps 23Mbps Rate Control CBR Audio Encoding Encoding MPEG 1 Layer 2 LC AAC Sampling rate 48KHz Bit rate 64Kbps 256Kbps each channel Multiplexing 2 ASI input multiplexed with local 1 channel of TS PID remapping automatically or manually Accurate PCR...

Page 7: ... 100V 220V 10 50 60Hz Consumption 25W 1 4 Appearance and Description Front and Rear Panel Illustration 1 Port Power supply and Grounding Pole 2 HDMI input 3 ASI input 4 Data Port Indicator 5 ASI output port 6 DATA Port 7 NMS CAS 8 Second DATA Port for OSD interface ...

Page 8: ...r of the products when the power is on After use securely stow away all loose cables external antenna and others 2 2 Power precautions When you connect the power source make sure if it may cause overload Avoid operating on a wet floor in the open Make sure the extension cable is in good condition Make sure the power switch is off before you start to install the device 2 3 Device s Installation Flo...

Page 9: ...Fire Protection Fire alarm system and extinguisher Power Requiring device power air conditioning power and lighting power are independent to each other Device power requires AC 110V 10 50 60Hz or AC 220V 10 50 60Hz Please carefully check before running 2 5 Grounding Requirement All function modules good grounding is the basis of reliability and stability of devices Also they are the most important...

Page 10: ...l Connect the PC Personal Computer and the device with net cable and use ping command to confirm they are on the same network segment I G the PC IP address is 192 168 99 252 we then change the device IP to 192 168 99 xxx xxx can be 1 to 254 except 252 to avoid IP conflict Second DATA Port for OSD interface IP address is 192 168 0 137 II Use web browser to connect the device with PC by inputting th...

Page 11: ...rs ENCODER LAVISION 8811UE support 1 channel HDMI input 1 for backup From the menu on left side of the webpage clicking encoder it displays the information of each encoding channel as Figure 3 User can click any item here to enter the corresponding interface to check information or set the parameters Current software version information ...

Page 12: ...From the menu on up side of the webpage clicking Stream select it displays the interface where users can select program s to multiplex out and modify program info Figure 4 Figure 4 Configure Input Area and Output Area with buttons in Operation Area Instructions are as below status Audio Status read area Input Area Output Area Operation Area Select Encoding Channels here Video Status read area ...

Page 13: ...gram information To refresh the output program information Select one input program first and click this button to transfer the selected program to the right box to output Similarly user can cancel the multiplexed programs from the right box To select all the input programs To select all the output programs To parse programs time limitation of parsing input programs Program Modification The multip...

Page 14: ...eters OSD Click OSD it will display the interface where to configuration the OSD parameters Browse and select the Logo which has been created Click here to comfirm the LOGO you selected Put your logo everywhere ...

Page 15: ...le out NIT insert VCT insert PCR correction Figure 6 Figure 6 TS Config PID Bypass From the TS Config menu on up side of the webpage clicking PID Bypass it displays the interface as Figure 7 where user can add PIDs to be passed click the symbol input current IP channel number then input current IP source Pid and output Pid which is customer needed then click set ...

Page 16: ...PTS format through the DATA1 and DATA2 port Click IP Stream it will display the interface where to set IP out parameters Figure 8 Figure 8 System Network Click Network it will display the interface as Figure 9 where to set network parameters Figure 9 Quickly Config Channel Config ...

Page 17: ...he screen as Figure 10 where to set the login account and password for the web NMS Figure 10 System Configuration From the menu on left side of the webpage clicking Configuration it will display the screen as Figure 11 where to save restore factory setting backup load your configurations Figure 11 ...

Page 18: ...king Firmware it will display the screen as Figure 12 where to update firmware for the modulator Figure 12 System Date Time From the menu on left side of the webpage clicking Date Time it will display the screen as Figure 13 where to set date and time for the device ...

Page 19: ...15 Figure 13 System Log From the menu on left side of the webpage clicking Log it will display the log interface as Figure 14 where to check or export the Kernel System log Figure 14 ...

Page 20: ...e good ventilation for the heat sink on the rear panel and other heat sink bores if necessary Checking the input AC within the power supply working range and the connection is correct before switching on device Checking the RF output level varies within tolerant range if it is necessary Checking all signal cables have been properly connected Frequently switching on off device is prohibited the int...

Page 21: ...17 Maintenance needed Chapter 5 Packing List LAVISION 8811UE UHD 4K HEVC Encoder 1 pcs User Manual 1 pcs Power Cord 1pcs ...

Reviews: