Teledyne CombiFlash Torrent Installation Manual Download Page 28

CombiFlash Torrent Installation Guide

Table 2-1 can be completed to verify and document the installation procedures 
contained in Section 2 of this guide.

Table 2-1 Installation Qualification Checklist

Step

Description

Installer 

Initials

Operator 

Initials

2.1

O

PTIONAL

 E

QUIPMENT

 M

ODULES

2.3

I

NSTRUMENT

 L

OCATION

2.3

C

ONNECT

 P

OWER

2.6

C

ONNECT

 I

NTERFACE

 C

ABLES

2.7

P

OSITION

 

THE

 T

ORRENT

2.8

C

ONNECT

 S

OLVENT

 S

ELECT

 V

ALVE

 

P

LUMBING

2.10

C

ONNECT

 W

ASTE

 L

INES

I

F

 

AN

 

OPTIONAL

 

WASTE

 

CAP

 

IS

 

NOT

 

USED

ENSURE

 

THE

 

WASTE

 

LINES

 

ARE

 

SECURED

SO

 

THEY

 

DRAIN

 

INTO

 

THE

 

WASTE

CONTAINER

. S

ECURE

 

THE

 W

ASTE

 L

EVEL

 

S

ENSE

 

AIR

 

TUBING

 

SO

 

ITS

 

OUTLET

 

IS

 

AT

 

LEAST

 

TWO

 

INCHES

 (5 

CM

BELOW

 

THE

 

CONTAINER

S

 

MAXIMUM

 

LEVEL

. S

EAL

 

THE

 

CONTAINER

 

OPENING

 

TO

 

AVOID

 

SOLVENT

VAPORS

.

2.11

C

ONNECT

 

AND

 R

OUTE

 D

RAIN

 L

INE

2.12

P

LUMBING

 O

PTIONAL

 M

ODULES

 

TO

 

T

ORRENT

2.13

G

ROUNDING

2.14

T

URN

 

ON

 P

OWER

2.13

C

ONFIGURE

 

THE

 T

ORRENT

2.17

P

URGE

 

THE

 I

NTERNAL

 S

OLVENT

 L

INES

 

(T

ORRENT

)

7

A

FTER

 

AT

 

LEAST

 400 

M

OF

 

SOLVENT

 

HAS

 

BEEN

 

PUMPED

TOUCH

 

THE

 S

TOP

 

BUTTON

.

Certification of Section 2 Completion

Installer Name (print):

Installer Signature:

Date:

Operator Name (print):

Operator Signature:

Date:

Comments:

2.20  Installation Qualification Checklist

Summary of Contents for CombiFlash Torrent

Page 1: ...der computer control at user selected flow rates between 50 and 1000 mL min The Torrent operates up to 100 psi 6 9 bar and can use low or medium pressure Flash columns for either normal or reversed ph...

Page 2: ...e control via Windows PC Software On screen method development and control with PeakTrak software Fraction collection Up to four fraction collectors fractionation valve or manual collection Solvent ma...

Page 3: ...local regulations In the event of a solvent or chemical spill your organization should have a plan to deal with these mishaps In all cases use good laboratory practices and standard safety procedures...

Page 4: ...ymbols Symboles de s curit Ce symbole signale l existence d instructions importantes relatives au produit dans ce manuel Ce symbole signale la pr sence d un danger d lectrocution Risque de pincement C...

Page 5: ...mail IscoService teledyne com Advertencias y Precauciones Esta se al le advierte sobre la importancia de las instrucciones del manual que acompa an a este producto Esta se al alerta sobre la presencia...

Page 6: ...CombiFlash Torrent Installation Guide...

Page 7: ...rent is shipped in a single carton The optional equipment will be shipped in additional cartons Carefully unpack the shipment and inspect the contents WARNING The Torrent is heavy Use a two person lif...

Page 8: ...be connected to a user supplied mast 2 5 Connect Power Ensure that the On Standby switch above the touch screen panel is in the Standby position Then use the supplied IEC power cord to connect the Tor...

Page 9: ...ction collectors via an Ethernet network To connect one or the first of multiple Foxys connect a standard straight through network cable between the Ethernet ports on the Torrent and a Foxy The second...

Page 10: ...ed Keep in mind that the valve wash waste is located on the Torrent s left side panel diverter valve waste will come from the fraction collector or fractionation valve usually positioned on the right...

Page 11: ...isopropyl alcohol some of which may drain when the caps are removed The Torrent may receive solvent from User supplied solvent containers at atmospheric pressure Pressurized or gravity fed solvent de...

Page 12: ...ional 1 8 turn 8 The Solvent Select Valve should be plumbed to the B Inlet of the Torrent Section 2 2 6 9 Locate the Sample Inlet line This assembly consists of two tubes fastened together a white sol...

Page 13: ...ngs from the source to the A Inlet and B Inlet ports on the side panel Note Solvent Level Sensing and B Solvent Prime options should be disabled when completing the system configuration settings in se...

Page 14: ...e carboy The small tube should extend 5 0 5 cm long from nut If the tube is missing insert it now and finger tighten the nut Figure 2 2 Optional Waste Cap 83B cap shown 4 The tubing is secured using m...

Page 15: ...view the options below and complete as necessary If any optional modules are not being installed you can skip this section and continue to Section 2 13 2 12 1 Optional Sample Load Pump 1 Position the...

Page 16: ...tion Guide Figure 2 4 Foxy R2 high flow diverter valve ports front view Use the supplied cable ties to secure the tubing as desired Before turning on any fraction collector manually move each fraction...

Page 17: ...e Fractionation Valve was shipped with pairs of numbered clips to simplify tube and container identification If desired attach the clips to the each end of the six outlet tubes 5 Secure the six outlet...

Page 18: ...Foxy R2 fraction collector Section 2 12 2 or the fractionation valve Section 2 6 3 Connect the ELSD to the DETECTOR port on the rear panel of the Foxy R2 or the fractionation valve with signal cable 2...

Page 19: ...25 OD x 0 188 ID x 100cm long black PTFE tubing w nut and ferrule swaged one end and a metal union on the other end To plumb the ELSD to the Torrent 1 With a 3 32 Allen wrench remove the PEEK tee fitt...

Page 20: ...bing Attach one end to the bottom of the metal tee fitting and the other end to the ELSD liquid inlet refer to Figure 2 11 Tighten fittings to finger tight 4 On the Torrent disconnect the black PTFE t...

Page 21: ...cation all components along the fluid path must be electrically grounded An electrical ground is necessary to dissipate electrostatic charges that may build while collecting fluids such as organic sol...

Page 22: ...to each unit Contact your IT department for assistance Note This section is dedicated to network configurations including the Foxy R2 fraction collector For comprehensive Torrent networking details re...

Page 23: ...4 Enter Fraction Collector IP information into Torrent up to four units Torrent Foxy R2 Network Configuration Examples Typical examples of Torrent Foxy R2 network connection are provided in this secti...

Page 24: ...ch unit connected to an Ethernet hub and then to your network The pass through function of a true Ethernet hub is required for this setup meaning all ports are sent the same signals Some switches can...

Page 25: ...nlet line is receiving hexane and the Solvent B inlet is receiving ethyl acetate 4 Select the Tools Manual Control menu command to open the Manual Control window 5 Select the THROUGH COLUMN CARTRIDGE...

Page 26: ...g the optional Solvent Selection Valve choose methanol or another suitable organic solvent as the B1 solvent and an additional organic solvent as the B2 solvent 4 Select the Tools Manual Control menu...

Page 27: ...is recommended that the system operation be verified To do so follow the directions supplied with the Torrent Verification Kit Be sure to follow the correct instructions depending if the system is set...

Page 28: ...SED ENSURE THE WASTE LINES ARE SECURED SO THEY DRAIN INTO THE WASTE CONTAINER SECURE THE WASTE LEVEL SENSE AIR TUBING SO ITS OUTLET IS AT LEAST TWO INCHES 5 CM BELOW THE CONTAINER S MAXIMUM LEVEL SEAL...

Page 29: ...y Use Standard Description Severity Applied Performance Criteria EN61000 4 2 Electrostatic Discharge Level 2 4kV contact discharge Level 3 8kV air discharge A EN61000 4 3 Radiated RF Immunity 80 MHz t...

Page 30: ...ct O ST O Represent the concentration of the hazardous substance in this component s any homogeneous pieces is lower than the ST standard limitation X ST X X Represent the concentration of the hazardo...

Reviews: