
Oxygen Analyzer
Installation
Teledyne Analytical Instruments
41
3.6
Powering Up the System
Before powering up the system, set the pressure regulator to
minimum to prevent damage due to incorrect setting. Power up the
system by turning on the switch on the rear. Then turn on the PPC by
pressing the button on its left side. Make sure that the Analyzer
application is running. If the Analyzer application is not running, launch
it by following the these steps:
•
Tap on
Start
found on the taskbar either at the bottom or the
top of the LCD screen of the PPC to pull down a menu.
•
Tap on
Programs
to bring up the programs browser.
•
Then tap on the
Analyzer
icon found in the browser. This
should launch the Analyzer application.
•
Adjust the internal pressure regulator until gas flow is in the
middle of the flowmeter, around the 1 SLPM mark.
•
Purge the sensor for about 15 minutes, then proceed to
connect the sensor cable.
•
Close the assembly drawer and tighten the thumb screws.
•
Purge the analyzer until readings decrease below 50 ppb.