![Teledyne 965 Five-Station Installation And Operation Manual Download Page 12](http://html.mh-extra.com/html/teledyne/965-five-station/965-five-station_installation-and-operation-manual_1080358012.webp)
965 Five-Station Battery Charger
1-4
1.3 Front and Rear Panel
Controls and
Connections
Refer to the figures below and to Table 1-3 for the front and rear
controls and connections on the Model 965 Five-Station Battery
Charger.
Figure 1-1 Battery Charger Rear Panel
Figure 1-2 Battery Charger Front Panel
1
2
3
D
WG 60-3004-166
Fan louvers - allow 4 inches (10 cm) clearance for ventilation
4
5
D
W
G 60-3004-166
Table 1-1 Front and Rear Panel Controls/Connections
Item
Function
1
Mains Input Power Connector
This is the disconnect device. Position the Model 965 so that either this connector or the mains
plug outlet is accessible in an emergency.
2
Mains Selector Switch
Before connecting the mains input power connector, make sure this is in the proper position for the
AC mains voltage you intend to connect to.
3
Circuit Breaker
This disconnects the power in the event of an internal component failure.
Summary of Contents for 965 Five-Station
Page 2: ......
Page 4: ......
Page 8: ...Five Station Battery Charger Safety vi...
Page 16: ...965 Five Station Battery Charger 1 8...
Page 18: ......
Page 20: ......
Page 22: ......