Teledyne 2100Ci Series Instruction Sheet Download Page 3

Instruction Sheet 69-2003-725 January 2019

Teledyne Isco

P.O. Box 82531, Lincoln, Nebraska, 68501 USA
Toll-free: (800) 775-2965 • Phone: (402) 464-0231 • Fax: (402) 465-3001
E-mail: [email protected]

Teledyne Isco is continually improving its products and reserves the right to change product
specifications, replacement parts, schematics, and instructions without notice.

EAR-Controlled Technology 

Subject to Restrictions Contained on the Cover Page”

Figure 6: APN location map

Note

If you are using a dynamic IP, please use the following

APN:

VZWINTERNET

Once you determine the APN you will be using, you

will need to connect to the modules with Flowlink and
navigate to the M

ODEM

tab.

1. In the M

ODEM

tab, you need to type the APN in

the field highlighted.

Figure 7: Modem screen

2. Apply the change in Flowlink and disconnect.

3. Then cycle power

ON

to the modules to allow the

modem to provision on the correct APN. The
modem will now be ready to operate correctly
on the Verizon network.

Note

Actual connection with the Verizon network may take

up to 45 minutes after cycling power.

If you have questions about APN set up on the Ver-

izon network, please contact the Product Support Group
at 1- 866-298-6174.

Reviews: