14
Teledyne API Model 480H O
3
Monitor User Manual
09421A DCN8343
3.1. UNPACKING
Upon receiving the 480H please verify that there is no apparent shipping damage.
(If damage has occurred please advise shipper first, then Teledyne API).
Check your packing slip for options that may be included, depending on your order,
e.g., disposable sample inlet filters.
3.2. MECHANICAL INSTALLATION
When installing the monitor be sure to leave sufficient clearance on sides, top, and
bottom for adequate ventilation and for access to make/adjust all connections. The
monitor must be mounted securely with four (4) bolts or anchors to a vertical
structure or wall capable of supporting 80 lbs. The mounting bolts or anchors must
be capable of supporting 20 lbs each. If using wall anchors, they must be suitable
for the type of wall construction and installed per the manufacturer’s specifications.
•
The illustrations in Figure 3-2 show the mounting dimensions and the
locations of the four mounting holes, which are 0.32” (8.128 mm)
diameter
•
All four mounting holes should be used to secure the monitor.
•
If using bolts, ensure they are stainless steel, 5/16” (8 mm) diameter,
capable of supporting 20 lbs each.