![Telect nrgSMART nrgCONTROL-BT Installation Manual Download Page 5](http://html.mh-extra.com/html/telect/nrgsmart-nrgcontrol-bt/nrgsmart-nrgcontrol-bt_installation-manual_1080071005.webp)
© Telect, Inc., All Rights Reserved, 145122-1 A0
1.509.926.6000 :: telect.com
3
nrgCONTROL-BT
Power
:: nrgSMART™ Controller with
Bluetooth
®
ALERT!
Verify that all connections meet requirements
specifi ed in local electric codes or operating company
guidelines before supplying power. Unit shall be protected by
a listed circuit breaker or branch-rated fuse rated maximum
10A.
INSTALL THIS PRODUCT WITHIN A RESTRICTED ACCESS
LOCATION WHERE ACCESS IS THROUGH THE USE
OF A TOOL, LOCK AND KEY, OR OTHER MEANS OF
SECURITY AND IS CONTROLLED BY THE AUTHORITY
RESPONSIBLE FOR THE LOCATION. ONLY QUALIFIED
TECHNICIANS MAY INSTALL AND MAINTAIN THIS
PRODUCT.
1.3 Installation
NOTE: Do not remove terminal protection brackets, until
panel is installed in a rack. If the panel is transported outside
of the shipping container, make sure the terminal protection
brackets are installed.
Inspection
Please read and understand all instructions before starting
installation. If you have questions, contact Telect Technical
Support at [email protected] or call 1.509.926.6000.
When you receive the equipment, carefully unpack it and
compare it to the packaging list. Please report any defective
or missing parts to Telect Quality at [email protected] or call
1.509.926.6000.
Telect is not liable for transit damaged. If the product is
damaged, please report it to the carrier and contact Telect
Quality.
NOTE: For service or warranty information, please visit the
telect.com website, or email inquiries to [email protected]
and click on the “Support” tab, or phone us at 800.551.4567
(domestic only) or 509.926.6000.
NOTE: The nrgCONTROL-BT is suitable for installation
as part of both a Common Bonding Network (CBN) and
Isolated Bonding Network (IBN) for installation in Network
Telecommunications Facilities and OSP.
Rack Mounting
• The nrgCONTROL-BT panel can be mounted in 19-in. &
23-in. EIA and WECO racks.
• The nrgCONTROL-BT panel can be fl ush-mounted to 4-in
extended in 1/2" increments.
1. Unscrew the mounting brackets from the panel and turn
them to the mounting position. See Figures 4 and 5 below.
2. Locate an unused rack position and mount panel to the
rack using the screws provided. It is best to mount the
panel as high as possible on the rack.
3. Tighten screws to 35 in.-lb (4.29 N•m). Telect
recommends using a seismic rack for best rigidity. Also,
if you intend on installing more than one panel per rack,
you need to plan a rack arrangement that dissipates heat
efficiently.
WARNING!
Failure to properly ground this equipment can
create hazardous conditions for installation personnel and for
the equipment.
WARNING
!
ALERT
!
Figure 4 - Bracket Orientation as Shipped
Figure 5 - Bracket Orientation for Rack Mounting