Telect, Inc. • USA +1.509.926.6000 • 52.33.3836.37.52
www.telect.com • © 2010 Telect, Inc., All Rights Reserved, 134269 A1
Page 2
NOTE:
For service or warranty information, please visit the telect.com website, or email inquiries
to [email protected] and click on the “Support” tab, or phone us at 800-551-4567 (domestic
only) or 509-926-6000.
WARNING
!
WARNING! Batteries and facility power systems present electrical voltage and amperage
levels that are considered an electrical hazard. Make sure that only qualified personnel are
allowed to install, operate, maintain, or otherwise come in contact with this equipment.
Remove all watches and jewelry before installing battery disconnect kits. Only use insu-
lated tools when working with batteries and facility power.
Procedure steps:
1. Disconnect power to the battery rack. Set all circuit breakers to OFF.
2. Install a circuit-breaker mounting bracket (item 5) and insulating pad (item 6) on the right-
hand side of the battery shelf with one 10-32 pan-head screw, one 10-32 flat-head screw, and
two 10-32 keps nuts.
3. Remove one 1/4-20 nut and flatwasher from each stud on the back of the circuit breaker.
4. Disconnect the hot collector bus cable from the hot battery terminal. Reconnect the cable to
the lower (load) terminal on the circuit breaker and secure with one 1/4-20 nut and flatwasher.
5. Connect the short cable (item 2) supplied with the kit to the upper (line) terminal on the circuit
breaker and secure with one 1/4-20 nut and flatwasher.
6. Connect the short cable to the hot battery terminal.
7. Install the circuit breaker (item 1) into the mounting bracket face plate (item 4) with two 6-32
pan-head screws.
8. Torque all battery connections as specified by the battery manufacturer’s
current specifications.
9. Install the mounting bracket face plate onto the mounting bracket with two 6-32 pan-head
screws.
10. Install the circuit breaker cover (item 3) with two 6-32 pan-head screws.
11. Repeat steps 3 through 9 for mounting the second circuit breaker on the left-hand side of the
battery shelf.
This procedure is complete.