3.1 Transportation
The VCBs are transported in the original packing only. Any kind of transport and combinations thereof are ap-
plicable. Transportation shall be provided in waterproof compartments. If air transport is used all products shall
be transported inside heated, pressurized compartments. The packed goods shall be handled in accordance with
the handling symbols. Loading procedures for VCB packaging shall be carried out only with use of fork lifts,
hoists or cranes. If possible the packaged VCB shall be placed on a pallet. During transportation the VCB must
not be subjected to sharp impacts or dropped.
3.2 Storage
If immediate installation is not possible, the VCB shall be stored in the original packing under the following
conditions:
• the ISM is switched off;
• dessicant must be placed in the packaging;
• storage must be dry, well ventilated and the room temperature should be between - 25°C and + 55°C.
Average humidity measured over 1 year period shall not exceed 75% at 50ºC. If several VCBs are stacked a ma-
ximum of two vertical layers are permitted
In case the storage term exceeds one year from the production date it is recommended to perform the procedu-
re of CM‘s electrolytic capacitor conditioning:
• apply power to the CM for 20 seconds;
• switch off the power supply and wait for 60 seconds;
• repeat the above actions 2 times;
• apply power to the CM continuously for 8 hours.
This procedure shall be performed annually during storage of the CM.
Figure 10
Lifting of ISM15_LD_1, ISM15_LD_3, ISM25_LD_1,
ISM25_LD_2, ISM15_LD_3
Figure 11
Lifting of ISM15_Shell_2
3.3 Unpacking and inspection
VCB unpacking and check
Before unpacking, check the carton for damage. Removal of the products from the original packaging must
be carried out with care and in accordance with lifting procedures. Every VCB component shall be checked for
completeness against the packing list included within the routine test certificate supplied with the CM and ISM.
These shall also be verified against the BOM list on the VCB packing list for VCB components and kits.
Unloading procedures for ISM shall be carried out only with use of hoists or cranes. Lifting gear must not be at-
tached to the support insulators; methods of lifting the ISM out of the carton shown below and must be strictly
followed.
Summary of Contents for TAVRIDA ELECTRIC VCB15 LD
Page 1: ...VCB Vacuum Circuit Breaker 17 5kV 31 5kA 2000A 24kV 16kA 800A User Guide...
Page 3: ...1 Product description...
Page 7: ...2 Nameplates and seals...
Page 11: ...3 Product handling...
Page 23: ...4 Installation...
Page 50: ...5 Commissioning...
Page 57: ...6 Operation...
Page 61: ...7 Maintenance and troubleshooting...
Page 66: ...8 Disposal...
Page 68: ...Appendix 1 Product range...
Page 71: ...Appendix 2 Overall drawings...
Page 74: ...75 ISM15_LD_3 Weight 13 kg ISM15_LD_6 PCD 133 mm Weight 55 kg...
Page 81: ...82 ISM25_LD_2 1 PCD 150 mm Weight 35 kg ISM25_LD_2 2 PCD 150 mm Weight 37 kg...
Page 85: ...Appendix 3 Secondary schemes...
Page 86: ...87...
Page 87: ...88...
Page 88: ...89...
Page 89: ...90...
Page 90: ...91...
Page 91: ...92...
Page 92: ...93...